WELL · 42-341-31936 · DISTRICT 10
Jones, C.R. A-3 #3
Moore County · Vertical
Jones, C.R. A-3 #3 (API 42-341-31936) is a permitted well in Moore County filed by Momentum Operating CO., Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1986 and 2010, permitted to 3,700 ft.
Completion filings report 3 formation tops, including Brown Dolomite, White Dolomite, Moore County Lime.
Operator of record
Albany, TX · P-5 Y, filed Jun 4, 2026 · 148 permits on file · (254) 559-7840
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Momentum Operating Co., Inc.through Sep 2014 |
| Latest permit | Momentum Operating Co., Inc.May 24, 2010 |
- 3,700
- total depth, ft
- 3
- permits on file
- May 24, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 4.42K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jones, C.R. A-3 G-14-258736 | Panhandle, West | IP Well Service LLC | 1 | 0 | 4.42K | Jul 2010 – Jul 2026 |
| Jones "A" O-14-6431 | Panhandle Moore County Field | IP Well Service LLC | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Momentum Operating Co., Inc.Sep 2010 → Sep 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 690302-99 | Reclass | Momentum Operating Co., Inc. | Jan 26, 2010 | May 24, 2010 | Jul 1, 2010 | 3,500 |
| 426757-99 | Recompletion | Lyco Energy Corporation | Aug 8, 1994 | Aug 8, 1994 | — | 3,700 |
| 321920-99 | Drill | Lyco Energy Corporation | Oct 16, 1986 | Oct 17, 1986 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-258736 | — | — | — | — |
| — | — O-14-6431 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,520 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,794 | 726 |
| Brown Dolomite | 2,830 | 690 |
| White Dolomite | 2,945 | 575 |
| Moore County Lime | 3,226 | 294 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,830 | 2,970 | Perforated |
| 3,503 | 3,570 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,634 | 12.25 | 425 S |
| 5.5 | 3,673 | 7.875 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 29, 2011 | Aug 9, 2010 | Yes |
| 00 | Feb 1, 2011 | — | — |
| 00 | May 18, 1987 | May 5, 1987 | Yes |
| 00 | May 13, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-31936 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-31936 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34131936, documented in the API reference.