WELL · 42-341-31948 · DISTRICT 10
Donelson C #4
Moore County · Panhandle Moore County Field field · Vertical
Donelson C #4 (API 42-341-31948) is a well in Moore County operated by Lyco Energy Corporation, completed June 30, 1987.
The RRC has issued 2 drilling permits between 1986 and 1997, permitted to 3,835 ft.
Completion filings report 3 formation tops, including Brown Dolomite, White Dolomite, Moore County Lime.
No lease production has been reported under this well’s leases.
Operator of record
Dallas, TX · P-5 Y, filed Oct 4, 2002 · 150 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lyco Energy Corporation |
| Production reports | Chesapeake Operating, Inc.through Sep 2002 |
| Latest permit | Lyco Energy CorporationOct 10, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,835
- total depth, ft
- 2
- permits on file
- Oct 10, 1997
- last permit issued
- Jun 30, 1987
- completed
- 0
- cumulative oil, bbl
- 179K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 30, 1987
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Donelson "C" G-14-166599 | Panhandle, West | Burk Royalty Co., Ltd. | 1 | 0 | 179K | Dec 1997 – Jul 2026 |
| Donelson "C" O-14-6449 | Panhandle Moore County Field | Lyco Energy Corporation | 1 | 0 | 0 | Jan 1993 – Apr 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lyco Energy CorporationJan 1998 → Aug 2000
- 2Chesapeake Operating, Inc.Sep 2000 → Sep 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 468198-99 | Reclass | Lyco Energy Corporation | Sep 30, 1997 | Oct 10, 1997 | Dec 12, 1997 | 3,835 |
| 322844-99 | Drill | Lyco Energy Corporation | Nov 7, 1986 | Nov 10, 1986 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-166599 | — | — | — | — |
| — | — O-14-6449 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,397 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,646 | 751 |
| White Dolomite | 2,888 | 509 |
| Moore County Lime | 2,978 | 419 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,710 | 3,021 | Perforated |
| 2,991 | 3,029 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,621 | 12.25 | 425 S |
| 5.5 | 3,840 | 7.875 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 2, 1998 | Jan 21, 1998 | Yes |
| 00 | Feb 26, 1998 | — | — |
| 00 | Aug 7, 1987 | Jul 8, 1987 | Yes |
| 00 | Jul 25, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-31948 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-31948 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34131948, documented in the API reference.