WELL · 42-341-32009 · DISTRICT 10
Meil #7
Moore County · Panhandle Moore County Field field · Vertical
Meil #7 (API 42-341-32009) is a plugged well in Moore County, plugged November 8, 1995, last operated by Five D CO.
The RRC has issued one drilling permit, issued September 2, 1987, permitted to 3,750 ft.
Completion filings report 4 formation tops, including Red Cave, Panhandle Lime, Brown Dolomite, Moore County Lime.
Its lease has reported 6.4K barrels of oil and 3.66K mcf of gas since January 1993, last reporting in September 1996. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Cactus, TX · P-5 Y, filed Jan 5, 1996 · 7 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
- 3,750
- total depth, ft
- 1
- permits on file
- Sep 2, 1987
- last permit issued
- Oct 24, 1987
- completed
- 6.4K
- cumulative oil, bbl
- 3.66K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 24, 1987
- Shut in
- —
- Plugged
- Nov 8, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Meil O-14-4612 | Panhandle Moore County Field | Five D Co | 6 | 6.4K | 3.66K | Jan 1993 – Sep 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Five D CoJan 1993 → Jun 1995
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-4612 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,652 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 2,174 | 1,478 |
| Panhandle Lime | 3,066 | 586 |
| Brown Dolomite | 3,518 | 134 |
| Moore County Lime | 3,658 | -6 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,520 | 3,620 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,632 | 12.25 | 600 S |
| 5.5 | 3,710 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 26, 1988 | Apr 7, 1988 | Yes |
| 00 | Apr 23, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-341-32009 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-341-32009 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34132009, documented in the API reference.