WELL · 42-341-32442 · DISTRICT 10

Reznik #1

Plugged

Moore County · Panhandle Moore County Field field  · Vertical

Reznik #1 (API 42-341-32442) is a plugged well in Moore County, plugged September 17, 2004, last operated by Chesapeake Operating Inc..

The RRC has issued one drilling permit, issued November 17, 1995, permitted to 3,650 ft.

It was permitted by Lyco Energy Corporation and has since transferred to Chesapeake Operating Inc. on the wellbore schedule.

Completion filings report 9 formation tops, including Red Cave, Panhandle Lime, Panhandle Lm., Brown Dolo..

Its lease has reported 9.3K barrels of oil and 5.35K mcf of gas since January 1996, last reporting in March 2005.

Operator of record

Chesapeake Operating Inc.

Permitted by Lyco Energy Corporation; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 13,061 permits on file · (405) 935-7500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsChesapeake Operating, Inc.through Jul 2001
Latest permitLyco Energy CorporationNov 17, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,650
total depth, ft
1
permits on file
Nov 17, 1995
last permit issued
Jan 8, 1998
completed
9.3K
cumulative oil, bbl
5.35K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Mar 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 8, 1998
Shut in
—
Plugged
Sep 17, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reznik O-14-7079Panhandle Moore County FieldChesapeake Operating, Inc.19.3K5.35KJan 1996 – Mar 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lyco Energy CorporationMar 1996 → Oct 1999
  2. 2Chesapeake Operating, Inc.Nov 1999 → Jul 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
442002-99DrillLyco Energy CorporationNov 16, 1995Nov 17, 1995Dec 6, 19953,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-7079————

Formation tops

As filed on W-2/G-1. Subsea from 3,609 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave1,8791,730
Panhandle Lime2,5761,033
Panhandle Lm.2,5761,033
Brown Dolo.2,842767
Brown Dolomite2,842767
White Dolo.2,981628
White Dolomite2,981628
Moore Co. Lm.3,154455
Moore County Lime3,154455

Perforations

Perforated and open-hole intervals.

FromToType
3,1283,138Perforated
3,1643,171Perforated
3,1763,183Perforated
3,2953,301Perforated
3,3053,311Perforated
3,3163,318Perforated
3,3303,340Perforated
3,3703,374Perforated
3,3863,390Perforated
3,4033,413Perforated
3,4283,432Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,63012.25760 S
5.53,6507.875140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 1998Feb 26, 1998—
00Apr 23, 1996Mar 22, 1996—
00Mar 7, 1996Feb 21, 1996Yes
00Mar 4, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34132442, documented in the API reference.