WELL · 42-345-30362 · DISTRICT 11

Moore #1

Plugged

Motley County · Wildcat field  · Vertical

Moore #1 (API 42-345-30362) is a plugged well in Motley County, plugged November 23, 2024, last operated by Gunn Oil CO..

The RRC has issued one drilling permit, issued September 20, 2024, permitted to 9,000 ft.

It was permitted by Gunn Oil Company and has since transferred to Gunn Oil CO. on the wellbore schedule.

Operator of record

Gunn Oil Co.

Permitted by Gunn Oil Company; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitGunn Oil CompanySep 20, 2024

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Sep 20, 2024
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 23, 2024

Surface location

33.953948, -100.802326

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Motley County.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
902788-99DrillGunn Oil CompanySep 20, 2024Sep 20, 2024Nov 4, 20249,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34530362, documented in the API reference.