WELL · 42-347-30691 · DISTRICT 6

Moore Marjorie M. #1

Plugged

Nacogdoches County · Toolan (Travis Peak) field  · Vertical

Moore Marjorie M. #1 (API 42-347-30691) is a plugged well in Nacogdoches County, plugged August 11, 1995, last operated by Young Clint Inc..

The RRC has issued 2 drilling permits between 1982 and 1983, permitted to 10,000 ft.

It was permitted by Hill International Production CO and has since transferred to Young Clint Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Rodessa, James Lime, Baxar Shale, Pettit.

Its 2 leases have reported 441 barrels of oil and 2.68K mcf of gas since January 1993, last reporting in December 1995. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Young Clint Inc.

Permitted by Hill International Production Co; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Jun 8, 2001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleYoung Clint Inc.
Production reportsCretaceous Investments, Inc.through Jan 1995
Latest permitHill International Production CoNov 30, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Nov 30, 1983
last permit issued
Sep 8, 1983
completed
441
cumulative oil, bbl
2.68K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 8, 1983
Shut in
—
Plugged
Aug 11, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Moore, Marjorie M. O-6-11010Toolan (Pettit, Lower)Young, Clint Inc.1441138Jan 1993 – Dec 1995
Moore, Marjorie M. G-6-108237Toolan (Travis Peak)Young, Clint Inc.102.54KJan 1993 – Aug 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Card Operating Company, Inc.Jan 1993 → Dec 1993
  2. 2Windwood Holding, Inc.Jul 1993 → Jan 1994
  3. 3Cretaceous Investments, Inc.Apr 1994 → Jan 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
223499-99RecompletionHill International Production CoSep 29, 1983Nov 30, 1983—10,000
153186-99DrillHill International Production CoMar 12, 1982Mar 12, 1982—9,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-108237————
—— O-6-11010————

Formation tops

As filed on W-2/G-1. Subsea from 354 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa6,230-5,876
James Lime6,776-6,422
Baxar Shale6,924-6,570
Pettit7,034-6,680
Travis Peak7,600-7,246
Cotton Valley9,720-9,366

Perforations

Perforated and open-hole intervals.

FromToType
7,3697,537Perforated
8,2668,850Perforated
9,2019,459Perforated
9,5629,667Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,78612.25900 S
2.3756,996——
4.59,8157.8751,490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 9, 1984Oct 3, 1983Yes
00Feb 6, 1984Oct 3, 1983—
00Jan 12, 1984Mar 14, 1983Yes
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34730691, documented in the API reference.