WELL · 42-347-31334 · DISTRICT 6
Adams #1
Nacogdoches County · Toolan (Pettit Lower) field · Vertical
Adams #1 (API 42-347-31334) is a plugged well in Nacogdoches County, plugged March 31, 2026, last operated by Southwest Operating Inc.-Tyler.
The RRC has issued one drilling permit, issued September 10, 1984, permitted to 8,000 ft.
It was permitted by Goldsmith, J. Paul and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.
Completion filings report 3 formation tops, including BMA, James Lime, Pettit.
Operator of record
Southwest Operating Inc.-Tyler
Permitted by Goldsmith, J. Paul; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Feb 4, 2026 · 63 permits on file · (903) 530-1563
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Operating Inc.-Tyler |
| Production reports | Atlantis Oil Company, Inc.through Jan 2021 |
| Latest permit | Goldsmith, J. PaulSep 10, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 1
- permits on file
- Sep 10, 1984
- last permit issued
- Nov 20, 1984
- completed
- 0
- cumulative oil, bbl
- 288K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 20, 1984
- Shut in
- —
- Plugged
- Mar 31, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Adams G-6-123496 | Toolan (Pettit, Lower) | Southwest Operating, Inc.-Tyler | 1 | 0 | 288K | Jan 1993 – Apr 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southwest Operating, Inc.-TylerJan 1993 → Mar 2001
- 2Atlantis Oil Company, Inc.Apr 2001 → Jan 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 250734-99 | Drill | Goldsmith, J. Paul | Aug 31, 1984 | Sep 10, 1984 | Sep 15, 1984 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-123496 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 350 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 6,183 | -5,833 |
| James LimeJAMES | 6,680 | -6,330 |
| Pettit | 6,950 | -6,600 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,237 | 7,507 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,479 | 12.25 | 585 S |
| 4.5 | 7,896 | 7.875 | 885 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 4, 1987 | Feb 26, 1987 | Yes |
| 00 | Mar 14, 1987 | — | — |
| 00 | Feb 28, 1985 | Dec 20, 1984 | Yes |
| 00 | Feb 20, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-347-31334 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-347-31334 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34731334, documented in the API reference.