WELL · 42-347-31376 · DISTRICT 6

Mast A.T. Etal J.J. Gas Unit #1

Plugged

Nacogdoches County · Naconiche Creek (Rod.-TP Cons.) field  · Vertical

Mast A.T. Etal J.J. Gas Unit #1 (API 42-347-31376) is a plugged well in Nacogdoches County, plugged February 11, 2026, last operated by Weatherly Oil & Gas LLC.

The RRC has issued 2 drilling permits between 1985 and 1996, permitted to 10,800 ft.

It was permitted by Jacobi-Johnson Energy, Inc. and has since transferred to Weatherly Oil & Gas LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Ugr, Glen Rose, BMA, James Lime.

Operator of record

Weatherly Oil & Gas LLC

Permitted by Jacobi-Johnson Energy, Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 5 permits on file · (405) 650-1207

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWeatherly Oil & Gas LLC
Production reportsChesapeake Operating, Inc.through May 2009
Latest permitJacobi-Johnson Energy, Inc.Feb 21, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,800
total depth, ft
2
permits on file
Feb 21, 1996
last permit issued
Feb 17, 1996
completed
0
cumulative oil, bbl
86.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 17, 1996
Shut in
—
Plugged
Feb 11, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mast, A.T. Etal J.J. Gas Unit G-6-158024Naconiche Creek (Rod.-TP Cons.)Weatherly Oil & Gas, LLC1084.5KFeb 1996 – Feb 2026
Mast, A. T. et al Gas Unit G-6-120572Naconiche Creek (Travis Peak)Jacobi-Johnson Energy, Inc.102.01KJan 1993 – Dec 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hurley Petroleum CorporationJan 1993 → Apr 1995
  2. 2Kaiser-Francis Oil CompanyJul 1995 → Dec 1995
  3. 3Jacobi-Johnson Energy, Inc.Feb 1996 → Dec 1998
  4. 4Exco Resources, Inc.Jan 1999 → Apr 2005
  5. 5Chesapeake Operating, Inc.May 2005 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
445049-99RecompletionJacobi-Johnson Energy, Inc.Feb 21, 1996Feb 21, 1996Feb 14, 199610,170
264527-99DrillPrairie Producing CompanyJan 8, 1986Jan 18, 1985Feb 17, 198510,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-120572————
—— G-6-158024————

Formation tops

As filed on W-2/G-1. Subsea from 398 ft elevation.Download CSV →

FormationMD ftSubsea
Ugr5,055-4,657
Glen RoseUPPER GLEN ROSE5,055-4,657
BMA6,740-6,342
James LimeJAMES7,235-6,837
PettitPETTET7,500-7,102
Pettit7,500-7,102
Travis Peak8,042-7,644
Cotton Vallet10,156-9,758
Cotton ValleyCOTTON VALLEY (KNOWLES)10,156-9,758

Perforations

Perforated and open-hole intervals.

FromToType
7,8727,880Perforated
8,3768,482Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,95012.251,113 S
5.510,1708.751,796 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 1996Feb 28, 1996Yes
00May 24, 1996——
00Apr 14, 1986Jan 16, 1986Yes
00Apr 5, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731376, documented in the API reference.