WELL · 42-347-31392 · DISTRICT 6

Latimer John P. #1

Plugged

Nacogdoches County · Naconiche Creek (Rod.-TP Cons.) field  · Vertical

Latimer John P. #1 (API 42-347-31392) is a plugged well in Nacogdoches County, plugged May 3, 2017, last operated by Snd Operating L.L.C..

The RRC has issued 2 drilling permits between 1985 and 1997, permitted to 10,700 ft.

It was permitted by Jacobi-Johnson Energy, Inc. and has since transferred to Snd Operating L.L.C. on the wellbore schedule.

Completion filings report 7 formation tops, including Glen Rose, BMA, James Lime, Pettit.

Operator of record

SND Operating L.L.C.

Permitted by Jacobi-Johnson Energy, Inc.; the EWA schedule now lists a different operator.

Kilgore, TX · P-5 Y, filed Jan 5, 2026 · 26 permits on file · (903) 983-0649

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSND Operating L.L.C.
Production reportsExco Resources, Inc.through Apr 2001
Latest permitJacobi-Johnson Energy, Inc.Mar 3, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,700
total depth, ft
2
permits on file
Mar 3, 1997
last permit issued
Feb 13, 1997
completed
0
cumulative oil, bbl
84.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 13, 1997
Shut in
—
Plugged
May 3, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Latimer, John P. G-6-164090Naconiche Creek (Rod.-TP Cons.)SND Operating, L.L.C.1083.6KFeb 1997 – May 2017
Latimer, John P. G-6-120950Naconiche Creek (Travis Peak)Jacobi-Johnson Energy, Inc.101.03KJan 1993 – Feb 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hurley Petroleum CorporationJan 1993 → Mar 1994
  2. 2Jacobi-Johnson Energy, Inc.Feb 1997 → Dec 1998
  3. 3Exco Resources, Inc.Jan 1999 → Apr 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
459233-99RecompletionJacobi-Johnson Energy, Inc.Feb 27, 1997Mar 3, 1997—8,100
269823-99DrillPrairie Producing CompanyApr 22, 1986Mar 18, 1985Apr 15, 198510,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-120950————
—— G-6-164090————

Formation tops

As filed on W-2/G-1. Subsea from 307 ft elevation.Download CSV →

FormationMD ftSubsea
Glen RoseUPPER GLEN ROSE4,930-4,623
BMA6,590-6,283
James LimeJAMES7,096-6,789
James Lime7,096-6,789
PettitPETTET7,373-7,066
Pettit7,373-7,066
Travis Peak7,980-7,673
Cotton ValleyCOTTON VALLEY (KNOWLES)10,223-9,916
CV Knowles10,223-9,916

Perforations

Perforated and open-hole intervals.

FromToType
7,7787,788Perforated
8,1168,152Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,94712.251,113 S
5.510,2308.751,405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 22, 1997Jun 23, 1997Yes
00Sep 5, 1997——
00May 12, 1986Apr 22, 1986Yes
00May 9, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731392, documented in the API reference.