WELL · 42-347-31560 · DISTRICT 6

Boatman Gas Unit #1

Plugged

Nacogdoches County · Naconiche Creek (Rod.-TP Cons.) field  · Vertical

Boatman Gas Unit #1 (API 42-347-31560) is a plugged well in Nacogdoches County, plugged May 7, 2026, last operated by Weatherly Oil & Gas LLC.

The RRC has issued 2 drilling permits (amended once) between 1989 and 2001, permitted to 8,800 ft.

It was permitted by Brg Petroleum Corporation and has since transferred to Weatherly Oil & Gas LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Base Anhydrite, James Lime, Pettit, Travis Peak.

Operator of record

Weatherly Oil & Gas LLC

Permitted by BRG Petroleum Corporation; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 5 permits on file · (405) 650-1207

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWeatherly Oil & Gas LLC
Production reportsBRG Petroleum Corporationthrough Jun 2004
Latest permitBRG Petroleum CorporationDec 6, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,800
total depth, ft
3
permits on file
Dec 6, 2001
last permit issued
Feb 3, 2002
completed
0
cumulative oil, bbl
52.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 3, 2002
Shut in
—
Plugged
May 7, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Boatman Gas Unit G-6-200605Naconiche Creek (Rod.-TP Cons.)Weatherly Oil & Gas, LLC10978Feb 2002 – May 2026
Boatman G-6-132773Naconiche Creek (Travis Peak)BRG Petroleum Corporation1051.8KJan 1993 – May 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cippele Resources Co.Jan 1993 → May 1994
  2. 2CRH EnterprisesJun 1994 → Jun 1994
  3. 3Jacobi-Johnson Energy, Inc.Jul 1994 → Dec 1998
  4. 4Exco Resources, Inc.Jan 1999 → Aug 2000
  5. 5BRG Petroleum CorporationOct 2000 → Jun 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
515687-98DrillBRG Petroleum CorporationMar 25, 2004Dec 6, 2001Jan 5, 20028,500
515687-99RecompletionBRG Petroleum CorporationNov 29, 2001Dec 6, 2001—7,600
357954-99DrillCippele Resources Co.Apr 10, 1989May 24, 1989—8,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-132773————
—— G-6-200605————

Formation tops

As filed on W-2/G-1. Subsea from 470 ft elevation.Download CSV →

FormationMD ftSubsea
Base Anhydrite6,576-6,106
James Lime7,152-6,682
Pettit7,407-6,937
Travis Peak7,978-7,508

Perforations

Perforated and open-hole intervals.

FromToType
6,7106,737Perforated
8,1288,138Perforated
8,3188,322Perforated
8,3618,364Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,55512.25590 S
4.58,4957.875895 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 3, 2004Mar 5, 2004Yes
00Apr 28, 2004——
00Jan 28, 1991Sep 28, 1990—
00Jan 11, 1990Dec 5, 1989Yes
00Jan 9, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731560, documented in the API reference.