WELL · 42-347-31667 · DISTRICT 6
Chandler #1
Nacogdoches County · Black Bayou (James) field · Horizontal · Sidetrack
Chandler #1 (API 42-347-31667) is a plugged horizontal well in Nacogdoches County, plugged February 21, 2015, last operated by Encana Oil & Gas(USA) Inc..
The RRC has issued 2 drilling permits (amended twice) between 2000 and 2001, permitted to 11,500 ft.
It was permitted by Grimes Energy Company and has since transferred to Encana Oil & Gas(USA) Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Rodessa, Bexar, James Lime.
Operator of record
Permitted by Grimes Energy Company; the EWA schedule now lists a different operator.
Denver, CO · P-5 Y, filed Oct 2, 2020 · 3,078 permits on file · (877) 386-2200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Encana Oil & Gas(usa) Inc. |
| Production reports | none |
| Latest permit | Grimes Energy CompanyFeb 13, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 4
- permits on file
- Feb 13, 2001
- last permit issued
- Mar 29, 2002
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2000 THROUGH Feb 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 29, 2002
- Shut in
- —
- Plugged
- Feb 21, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chandler G-6-181223 | Black Bayou (James) | Encana Oil & Gas(usa) Inc. | 1 | 0 | 0 | Apr 2000 – Feb 2015 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 505273-98 | Recompletion · sidetrack | Grimes Energy Company | Mar 8, 2001 | Feb 13, 2001 | — | 9,600 |
| 505273-99 | Recompletion · sidetrack | Grimes Energy Company | Feb 13, 2001 | Feb 13, 2001 | Mar 3, 2001 | 9,600 |
| 491890-98 | Drill | Grimes Energy Company | Mar 23, 2000 | Feb 8, 2000 | — | 9,600 |
| 491890-99 | Drill | Grimes Energy Company | Feb 8, 2000 | Feb 8, 2000 | Feb 14, 2000 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-181223 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 18 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 8,700 | -8,682 |
| Bexar | 9,136 | -9,118 |
| James LimeJAMES | 9,251 | -9,233 |
| James Lime | 9,251 | -9,233 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,409 | 13,333 | Perforated |
| 9,409 | 15,301 | Perforated |
| 9,409 | 15,301 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,915 | 12.25 | 1,050 S |
| 7 | 9,409 | 8.75 | 1,210 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 8, 2002 | Apr 25, 2002 | — |
| 00 | Jan 24, 2002 | Aug 6, 2001 | — |
| 00 | May 8, 2001 | Jan 29, 2001 | Yes |
| 00 | Mar 21, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-347-31667 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-347-31667 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34731667, documented in the API reference.