WELL · 42-347-31700 · DISTRICT 6

Winston John #1H

Y

Nacogdoches County · LA Nana Bayou (James Lime) field · Producing  · Horizontal

Winston John #1H (API 42-347-31700) is a horizontal well in Nacogdoches County operated by Texian Operating Company LLC, completed September 11, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 6, 2001, permitted to 10,000 ft.

It was permitted by Samson Lone Star LP and has since transferred to Texian Operating Company LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Massive Anhydrite (marker), Bexar Shale, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Texian Operating Company LLC

Permitted by Samson Lone Star LP; the EWA schedule now lists a different operator.

Irving, TX · P-5 Y, filed Apr 4, 2026 · (214) 649-9231

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexian Operating Company LLC
Production reportsTexian Operating Company, LLCthrough Jun 2025
Latest permitPedeco, Inc.Mar 6, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Mar 6, 2001
last permit issued
Sep 11, 2001
completed
0
cumulative oil, bbl
3.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 11, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Winston, John G-6-186053LA Nana Bayou (James Lime)Texian Operating Company, LLC103.36MSep 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 5,752 · prior 12 43,554(-87%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samson Lone Star LPSep 2001 → Jun 2007
  2. 2Samson Lone Star, LLCJul 2007 → Sep 2017
  3. 3Rockcliff Energy Operating LLCOct 2017 → Aug 2023
  4. 4Team Operating, L.L.C.Sep 2023 → Aug 2024
  5. 5Texian Operating Company, LLCSep 2024 → Jun 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
506140-98DrillSamson Lone Star LPNov 26, 2001Mar 6, 2001Apr 27, 200110,000
506140-99DrillPedeco, Inc.Mar 6, 2001Mar 6, 2001—10,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-186053————

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE8,417-8,057
Bexar Shale8,780-8,420
James LimeJAMES9,025-8,665

Perforations

Perforated and open-hole intervals.

FromToType
9,29317,003Perforated
9,40513,656Perforated
9,49716,081Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,42812.25920 S
79,2938.75587 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 14, 2002Oct 10, 2001Yes
00Dec 28, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731700, documented in the API reference.