WELL · 42-347-31849 · DISTRICT 6

Sandlin #1

Y

Nacogdoches County · Douglass SW. (Pettit Upper) field · Producing  · Vertical

Sandlin #1 (API 42-347-31849) is a well in Nacogdoches County operated by Uphill Consulting LLC, completed September 19, 2010 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2003 and 2010, permitted to 10,600 ft.

It was permitted by Ark-La-Tex Energy, L.L.C. and has since transferred to Uphill Consulting LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Massive Anhydrite (marker), Rodessa, James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Uphill Consulting LLC

Permitted by Ark-LA-Tex Energy, L.L.C.; the EWA schedule now lists a different operator.

Pearland, TX · P-5 Y, filed Jan 4, 2026 · (940) 923-7859

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUphill Consulting LLC
Production reportsUphill Consulting LLCthrough Apr 2026
Latest permitArk-LA-Tex Energy, L.L.C.Sep 10, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
2
permits on file
Sep 10, 2010
last permit issued
Sep 19, 2010
completed
0
cumulative oil, bbl
422K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 19, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sandlin G-6-202395Douglass, W. (Travis Peak)Uphill Consulting LLC10254KApr 2004 – Jul 2026
Sandlin G-6-257716Douglass,sw. (Pettit, Upper)Uphill Consulting LLC10167KSep 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 2,189 · prior 12 2,494(-12%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ark-LA-Tex Energy, L.L.C.May 2004 → Aug 2025
  2. 2Uphill Consulting LLCSep 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
701994-99RecompletionArk-LA-Tex Energy, L.L.C.Sep 9, 2010Sep 10, 2010Sep 12, 201010,600
538727-99DrillArk-LA-Tex Energy, L.L.C.Nov 18, 2003Nov 21, 2003Feb 11, 200410,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-202395————
—— G-6-257716————

Formation tops

As filed on W-2/G-1. Subsea from 371 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE8,185-7,814
Rodessa8,230-7,859
James Lime8,688-8,317
PettitPETTET8,942-8,571
Pettit8,942-8,571
Travis Peak9,512-9,141

Perforations

Perforated and open-hole intervals.

FromToType
9,1829,193Perforated
9,1969,207Perforated
9,3909,701Perforated
9,7989,866Perforated
9,98910,137Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,71712.25722 S
4.510,5967.8752,180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2015Sep 29, 2010Yes
00Oct 21, 2010——
00Aug 24, 2004Jun 14, 2004Yes
00Jul 26, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.