WELL · 42-347-31866 · DISTRICT 6

Hart #1

Plugged

Nacogdoches County · Naconiche Creek (Rod.-TP Cons.) field  · Vertical

Hart #1 (API 42-347-31866) is a plugged well in Nacogdoches County, plugged April 14, 2026, last operated by Weatherly Oil & Gas LLC.

The RRC has issued 2 drilling permits in 2004, permitted to 8,975 ft.

It was permitted by Brg Petroleum Corporation and has since transferred to Weatherly Oil & Gas LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Massive Anhydrite (marker), James Lime, Pettit, Travis Peak.

Operator of record

Weatherly Oil & Gas LLC

Permitted by BRG Petroleum Corporation; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 5 permits on file · (405) 650-1207

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWeatherly Oil & Gas LLC
Production reportsWeatherly Oil & Gas, LLCthrough Sep 2018
Latest permitBRG Petroleum CorporationSep 3, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,975
total depth, ft
2
permits on file
Sep 3, 2004
last permit issued
Mar 26, 2007
completed
0
cumulative oil, bbl
926K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 26, 2007
Shut in
—
Plugged
Apr 14, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hart G-6-204383Naconiche Creek (Rod.-TP Cons.)Weatherly Oil & Gas, LLC10823KSep 2004 – Jul 2026
Hart G-6-201950Naconiche Creek (Travis Peak)Chesapeake Operating, Inc.10102KApr 2004 – Dec 2005
Hart G-6-201951Naconiche Creek (Pettit)Chesapeake Operating, Inc.100Apr 2004 – Dec 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BRG Petroleum CorporationApr 2004 → Feb 2005
  2. 2Chesapeake Operating, Inc.Mar 2005 → Mar 2014
  3. 3SND Operating, L.L.C.Nov 2016 → Nov 2016
  4. 4Weatherly Oil & Gas, LLCSep 2018 → Sep 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
550379-99RecompletionBRG Petroleum CorporationSep 1, 2004Sep 3, 2004—8,975
540297-99DrillBRG Petroleum CorporationJan 2, 2004Jan 6, 2004Feb 26, 20048,975

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-201950————
—— G-6-201951————
—— G-6-204383————

Formation tops

As filed on W-2/G-1. Subsea from 483 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE6,656-6,173
James LimeJAMES7,154-6,671
Pettit7,405-6,922
Travis Peak7,848-7,365

Perforations

Perforated and open-hole intervals.

FromToType
6,7606,761Perforated
7,6947,896Perforated
8,0088,714Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,71711440 S
4.58,9627.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 2007Apr 13, 2007—
00Aug 18, 2006Mar 13, 2006—
00Feb 3, 2005Sep 20, 2004Yes
00Dec 2, 2004——
00Aug 5, 2004May 14, 2004Yes
00Jul 8, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34731866, documented in the API reference.