WELL · 42-347-32373 · DISTRICT 6
Anderson-Crump #1
Nacogdoches County · Martinsville (Travis Peak) field · Vertical
Anderson-Crump #1 (API 42-347-32373) is a plugged well in Nacogdoches County, plugged May 23, 2023, last operated by Etoco L.P..
The RRC has issued one drilling permit, issued August 31, 2006, permitted to 11,000 ft.
It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Etoco L.P. on the wellbore schedule.
Completion filings report 6 formation tops, including Glen Rose, Massive Anhydrite (marker), Rodessa, Bexas.
Operator of record
Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 4, 2026 · 48 permits on file · (713) 805-3001
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Etoco L.P. |
| Production reports | Etoco, L.P.through May 2023 |
| Latest permit | Encana Oil & Gas(usa) Inc.Aug 31, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 1
- permits on file
- Aug 31, 2006
- last permit issued
- Nov 3, 2006
- completed
- 0
- cumulative oil, bbl
- 273K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH May 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 3, 2006
- Shut in
- —
- Plugged
- May 23, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anderson-Crump G-6-224255 | Martinsville (Travis Peak) | Etoco, L.P. | 1 | 0 | 273K | Nov 2006 – May 2023 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Encana Oil & Gas(usa) Inc.Nov 2006 → Jun 2009
- 2Etoco, L.P.Jul 2009 → May 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 625179-99 | Drill | Encana Oil & Gas(usa) Inc. | Aug 29, 2006 | Aug 31, 2006 | Sep 30, 2006 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-224255 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 294 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen RoseGLENROSE | 5,282 | -4,988 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 6,646 | -6,352 |
| Rodessa | 6,842 | -6,548 |
| Bexas | 7,247 | -6,953 |
| James LimeJAMES | 7,384 | -7,090 |
| Pine Island | 7,553 | -7,259 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,640 | 9,285 | Perforated |
| 9,513 | 9,516 | Perforated |
| 9,548 | 9,551 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,415 | 12.25 | 865 S |
| 5.5 | 10,900 | 7.875 | 1,206 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 26, 2007 | Jan 10, 2007 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-347-32373 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-347-32373 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34732373, documented in the API reference.