WELL · 42-347-32502 · DISTRICT 6

Black Stone #4

Y

Nacogdoches County · Nacogdoches E. (James Lime) field · SWR-10-Well  · Directional

Black Stone #4 (API 42-347-32502) is a well in Nacogdoches County operated by Wallace Operating Company LLC, completed May 9, 2007 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 13, 2007, permitted to 12,000 ft.

It was permitted by Samson Lone Star LP and has since transferred to Wallace Operating Company LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Ridessa, Rodessa, Bexar, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Wallace Operating Company LLC

Permitted by Samson Lone Star LP; the EWA schedule now lists a different operator.

Metairie, LA · P-5 Y, filed Sep 4, 2025 · (504) 504-9973

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWallace Operating Company LLC
Production reportsRockcliff Energy Operating LLCthrough Mar 2019
Latest permitSamson Lone Star LPMar 13, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Mar 13, 2007
last permit issued
May 9, 2007
completed
0
cumulative oil, bbl
1.46M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 9, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone G-6-229094Miyagi (Pettit)Wallace Operating Company LLC101.46MMay 2007 – Jul 2026
Black Stone G-6-229095Douglass, W. (Travis Peak)Wallace Operating Company LLC100May 2007 – Jul 2026
Black Stone G-6-229096Nacogdoches, E. (James Lime)Wallace Operating Company LLC100May 2007 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samson Lone Star, LLCMay 2007 → Jan 2016
  2. 2Rockcliff Energy Operating LLCMar 2019 → Mar 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
634711-98DrillSamson Lone Star LPApr 27, 2007Mar 13, 2007Apr 5, 200712,000
634711-99DrillSamson Lone Star LPMar 6, 2007Mar 13, 2007Apr 5, 200712,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-229094————
—— G-6-229095————
—— G-6-229096————

Formation tops

As filed on W-2/G-1. Subsea from 374 ft elevation.Download CSV →

FormationMD ftSubsea
Ridessa7,726-7,352
Rodessa7,726-7,352
Bexar7,968-7,594
James LimeJAMES8,242-7,868
Pettit8,507-8,133

Perforations

Perforated and open-hole intervals.

FromToType
8,3148,340Perforated
8,8008,810Perforated
9,1439,194Perforated
9,14310,276Perforated
9,4289,879Perforated
10,08610,276Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,51312.251,100 S
4.510,4398.751,175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 2, 2008Jun 5, 2008—
00Aug 28, 2007Jun 26, 2007Yes
00Aug 24, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34732502, documented in the API reference.