WELL · 42-347-33181 · DISTRICT 6
Chireno SWD #1
Nacogdoches County · Carthage (Haynesville Shale) field · Injection · Vertical
Chireno Swd #1 (API 42-347-33181) is a well in Nacogdoches County operated by Common Disposal LLC, completed March 18, 2011 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued August 12, 2010, permitted to 9,000 ft.
It was permitted by Select Energy Services, LLC and has since transferred to Common Disposal LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Midway, Saratoga Chalk, Pecan Gap, Austin Chalk.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 4.36M barrels injected in the 12 months reported through November 2025.
Operator of record
Permitted by Select Energy Services, LLC; the EWA schedule now lists a different operator.
Chireno, TX · P-5 Y, filed Oct 4, 2025 · 10 permits on file · (936) 275-7057
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Common Disposal LLC |
| Production reports | none |
| Latest permit | Chireno Disposal, LLCAug 12, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 2
- permits on file
- Aug 12, 2010
- last permit issued
- Mar 18, 2011
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 18, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chireno SWD G-6-260963 | Carthage (Haynesville Shale) | Common Disposal, LLC | 1 | 0 | 0 | Mar 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 700443-98 | Drill | Select Energy Services, LLC | Aug 10, 2011 | Aug 12, 2010 | Feb 7, 2011 | 9,000 |
| 700443-99 | Drill | Chireno Disposal, LLC | Aug 9, 2010 | Aug 12, 2010 | Feb 7, 2011 | 5,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-260963 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 320 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| MidwayMIDWAY SHALE | 2,796 | -2,476 |
| Saratoga Chalk | 3,787 | -3,467 |
| Pecan Gap | 4,150 | -3,830 |
| Austin Chalk | 4,847 | -4,527 |
| Georgetown | 5,239 | -4,919 |
| Austin Chalk | — | — |
| Georgetown | — | — |
| MidwayMIDWAY SHALE | — | — |
| Pecan Gap | — | — |
| Saratoga Chalk | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,055 | 5,180 | Perforated |
| 5,236 | 5,400 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,199 | 14.75 | 1,840 S |
| 7 | 5,898 | 9.875 | 1,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 19, 2011 | Oct 13, 2011 | — |
| 00 | Oct 12, 2011 | Aug 11, 2011 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-347-33181 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-347-33181 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 4.36M
- bbl, last 12 reported months
- 30.8M
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102297 | W-14 Disposal | Active | 25,000 | 2,545 | 5,090–5,400 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 4,360,333 · prior 12 3,718,376(+17%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34733181, documented in the API reference.