WELL · 42-349-30783 · DISTRICT 5

Jackson J. A. #5-RI

Plugged

Navarro County · Corsicana (Shallow) field  · Vertical

Jackson J. A. #5-RI (API 42-349-30783) is a plugged well in Navarro County, plugged July 15, 2010, last operated by Ridenour Randy Independent.

The RRC has issued one drilling permit, issued September 7, 1978, permitted to 800 ft.

It was permitted by Stroube Development CO. and has since transferred to Ridenour Randy Independent on the wellbore schedule.

Completion filings report 2 formation tops, including Midway, Nacatoch.

Its lease has reported 2.47K barrels of oil and 14 mcf of gas since January 1993, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Ridenour Randy Independent

Permitted by Stroube Development Co.; the EWA schedule now lists a different operator.

Plano, TX · P-5 Y, filed Oct 8, 2010

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRidenour Randy Independent
Production reportsRidenour, Randy Independentthrough Mar 2001
Latest permitStroube Development Co.Sep 7, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

800
total depth, ft
1
permits on file
Sep 7, 1978
last permit issued
Oct 4, 1978
completed
2.47K
cumulative oil, bbl
14
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 4, 1978
Shut in
—
Plugged
Jul 15, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jackson, J. A. O-5-1715Corsicana (Shallow)Ridenour, Randy Independent132.47K14Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1ZSX, Inc.Jan 1993 → Aug 1993
  2. 2Brown, C. L. Inc.Sep 1993 → Dec 1993
  3. 3Haynie Drilling Co. Inc.Jan 1994 → Jan 1994
  4. 4Ridenour, RandyMar 1994 → May 1994
  5. 5Ridenour, Randy IndependentJun 1994 → Mar 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
32125-99DrillStroube Development Co.Sep 7, 1978Sep 7, 1978—800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-1715————

Formation tops

As filed on W-2/G-1. Subsea from 370 ft elevation.Download CSV →

FormationMD ftSubsea
MidwayMIDWAY SHALE1369
Nacatoch580-210

Perforations

Perforated and open-hole intervals.

FromToType
706725Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.8757505.62570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 25, 1987Jul 27, 1987—
00Jan 12, 1984Oct 10, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

90
bbl, last 12 reported months
102K
bbl, all reported
Oct 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000005259H-1 InjectionPlugged Aug 2, 201090250706–725

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 90 · prior 12 158(-43%)

05010019992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34930783, documented in the API reference.