WELL · 42-349-31267 · DISTRICT 5

Clark Dorothy Oil Unit -B- #1

Plugged

Navarro County · Cheneyboro (Cotton Valley) field  · Vertical

Clark Dorothy Oil Unit -B- #1 (API 42-349-31267) is a plugged well in Navarro County, plugged March 2, 1987, last operated by Tarrant County Water District #1.

The RRC has issued 2 drilling permits between 1980 and 1986, permitted to 10,000 ft.

It was permitted by Bledsoe Petro Corporation and has since transferred to Tarrant County Water District #1 on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.

Operator of record

Tarrant County Water District #1

Permitted by Bledsoe Petro Corporation; the EWA schedule now lists a different operator.

Streetman, TX · P-5 New, filed May 15, 1987 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTarrant County Water District #1
Production reportsnone
Latest permitBledsoe Petro CorporationSep 18, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Sep 18, 1986
last permit issued
Oct 2, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 2, 1986
Shut in
—
Plugged
Mar 2, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
320541-99RecompletionBledsoe Petro CorporationSep 15, 1986Sep 18, 1986—9,900
81580-99DrillAmoco Production CompanyMay 20, 1980May 20, 1980May 23, 198010,000

Formation tops

As filed on W-2/G-1. Subsea from 295 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,866-5,571
Pettit6,378-6,083
Travis Peak6,530-6,235
Cotton ValleyCOTTON VALLEY SAND8,000-7,705
Cotton ValleyCOTTON VALLEY LIME9,380-9,085

Perforations

Perforated and open-hole intervals.

FromToType
5,8915,895Perforated
9,3989,577Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1610026392 S
9.6253,86512.252,030 S
2.3759,310——
5.59,9008.752,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 2, 1987Oct 14, 1986Yes
00Jan 12, 1984Sep 29, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34931267, documented in the API reference.