WELL · 42-349-31663 · DISTRICT 5
Anderson Joe E. #2
Navarro County · Reka (Travis Peak) field · Vertical
Anderson Joe E. #2 (API 42-349-31663) is a plugged well in Navarro County, plugged June 21, 1997, last operated by Brooks Pipe & Supply CO..
The RRC has issued 2 drilling permits between 1981 and 1994, permitted to 11,785 ft.
It was permitted by Texaco E & P Inc. and has since transferred to Brooks Pipe & Supply CO. on the wellbore schedule.
Operator of record
Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.
Kilgore, TX · P-5 Y, filed Mar 6, 1998
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brooks Pipe & Supply Co. |
| Production reports | Texaco E & P Inc.through Mar 1994 |
| Latest permit | Texaco E & P Inc.Aug 23, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,785
- total depth, ft
- 2
- permits on file
- Aug 23, 1994
- last permit issued
- Jul 12, 1994
- completed
- 0
- cumulative oil, bbl
- 107K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 12, 1994
- Shut in
- —
- Plugged
- Jun 21, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anderson, Joe E. G-5-150946 | Reka (Travis Peak) | Brooks Pipe & Supply Co. | 1 | 0 | 0 | Jul 1994 – Jun 1997 |
| Anderson, Joe E. G-5-95960 | Aker (Smackover) | Texaco E & P Inc. | 1 | 0 | 107K | Jan 1993 – Jul 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Mar 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 427090-99 | Recompletion | Texaco E & P Inc. | Aug 17, 1994 | Aug 23, 1994 | Mar 24, 1994 | 9,588 |
| 111059-99 | Drill | Getty Oil Co. | Mar 6, 1981 | Mar 6, 1981 | Mar 11, 1981 | 11,785 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-95960 | — | — | — | — |
| — | — G-5-150946 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,204 | 7,210 | Perforated |
| 7,276 | 7,280 | Perforated |
| 11,423 | 11,710 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 60 | 30 | — |
| 13.375 | 625 | 17.5 | 740 S |
| 9.625 | 4,435 | 12.25 | 750 S |
| 2.875 | 11,325 | — | — |
| 5.5 | 11,823 | 8.75 | 3,058 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 1994 | Aug 24, 1994 | Yes |
| 00 | Sep 27, 1994 | — | — |
| 00 | Jan 12, 1984 | Sep 1, 1981 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-349-31663 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-349-31663 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34931663, documented in the API reference.