WELL · 42-349-32676 · DISTRICT 5
Edens A #1
Navarro County · Powell field · Vertical
Edens A #1 (API 42-349-32676) is a plugged well in Navarro County, plugged May 27, 2023, last operated by Platform Operating LLC.
The RRC has issued one drilling permit, issued June 17, 1982, permitted to 4,000 ft.
It was permitted by Navarro Waterflood CO. and has since transferred to Platform Operating LLC on the wellbore schedule.
Operator of record
Permitted by Navarro Waterflood Co.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Nov 4, 2025 · 2 permits on file · (432) 625-0869
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Platform Operating LLC |
| Production reports | none |
| Latest permit | Navarro Waterflood Co.Jun 17, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Jun 17, 1982
- last permit issued
- Dec 30, 2005
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 30, 2005
- Shut in
- —
- Plugged
- May 27, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Edens 'A' O-5-2449 | Powell | Platform Operating, LLC | 1 | 0 | 0 | Jan 1993 – Sep 2023 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 164025-99 | Drill | Navarro Waterflood Co. | Jun 17, 1982 | Jun 17, 1982 | Jun 23, 1982 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-2449 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,320 | 3,780 | Perforated |
| 3,336 | 3,770 | Perforated |
| 3,638 | 3,748 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 176 | 14.75 | 75 S |
| 2.875 | 1,200 | — | — |
| 7 | 3,803 | 9.5 | 680 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 2007 | Mar 26, 2007 | — |
| 00 | Mar 20, 2003 | Jan 15, 2003 | — |
| 00 | Jan 12, 1984 | Jul 14, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-349-32676 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-349-32676 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 2.01M
- bbl, all reported
- Nov 2022
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000091981 | H-1 Injection | Plugged Aug 28, 2023 | 10,000 | 1,220 | 2,440–3,780 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 439(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34932676, documented in the API reference.