WELL · 42-349-32707 · DISTRICT 5

Kent G. H. Estate #1

Plugged

Navarro County · Corsicana (Shallow) field  · Vertical

Kent G. H. Estate #1 (API 42-349-32707) is a plugged well in Navarro County, plugged September 25, 1987, last operated by Tarrant County Water District #1.

The RRC has issued one drilling permit, issued July 12, 1982, permitted to 1,900 ft.

It was permitted by Jackson & Ray and has since transferred to Tarrant County Water District #1 on the wellbore schedule.

Completion filings report one formation top, including Upper Nacotoch.

Operator of record

Tarrant County Water District #1

Permitted by Jackson & Ray; the EWA schedule now lists a different operator.

Streetman, TX · P-5 New, filed May 15, 1987 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTarrant County Water District #1
Production reportsnone
Latest permitJackson & RayJul 12, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,900
total depth, ft
1
permits on file
Jul 12, 1982
last permit issued
Jun 15, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 15, 1983
Shut in
—
Plugged
Sep 25, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
165965-99DrillJackson & RayJul 12, 1982Jul 12, 1982—1,900

Formation tops

As filed on W-2/G-1. Subsea from 309 ft elevation.Download CSV →

FormationMD ftSubsea
Upper Nacotoch865-556

Perforations

Perforated and open-hole intervals.

FromToType
870885Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,055——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 29, 1984Oct 15, 1984—
00Nov 17, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34932707, documented in the API reference.