WELL · 42-349-33050 · DISTRICT 5

Caston #1

N

Navarro County · Roundhouse (Haynesville) field  · Vertical

Caston #1 (API 42-349-33050) is a well in Navarro County operated by Marathon Oil Company, completed February 20, 1983.

The RRC has issued 2 drilling permits between 1982 and 1992, permitted to 11,300 ft.

Completion filings report 6 formation tops, including Glen Rose, Rodessa, Pettit, Travis Peak.

Its 2 leases have reported 32.1K barrels of oil and 109K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Marathon Oil Company

Houston, TX · P-5 Y, filed Apr 4, 2026 · 3,707 permits on file · (800) 332-9449

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil Company
Production reportsUrsus Oil and Gasthrough Jul 2025
Latest permitMarathon Oil CompanyDec 29, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,300
total depth, ft
2
permits on file
Dec 29, 1992
last permit issued
Feb 20, 1983
completed
32.1K
cumulative oil, bbl
109K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 20, 1983
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caston O-5-3439Pan Ware (Rodessa)Ursus Oil and Gas232.1K109KJan 1993 – Jul 2026
Caston G-5-104481Roundhouse (Haynesville)Marathon Oil Company100Jan 1993 – Mar 1993

Oil, barrels lease total

Last 12 months 12 · prior 12 42(-71%)

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → May 1995
  2. 2Map Production Co., Inc.Jun 1995 → Feb 2005
  3. 3Samson Lone Star LPMar 2005 → Jun 2007
  4. 4Samson Lone Star, LLCJul 2007 → Nov 2009
  5. 5Ironwood Oil & Gas LLCDec 2009 → Jun 2014
  6. 6Cl&f Operating LLCJul 2014 → Mar 2015
  7. 7Ursus Oil and GasMay 2015 → Jul 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
407584-99RecompletionMarathon Oil CompanyDec 22, 1992Dec 29, 1992Oct 9, 199210,800
181466-99DrillTXO Production Corp.Dec 23, 1982Dec 23, 1982Jan 13, 198311,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-104481————
—— O-5-3439————

Formation tops

As filed on W-2/G-1. Subsea from 331 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose5,223-4,892
Rodessa6,393-6,062
Pettit6,948-6,617
Travis Peak7,105-6,774
Bossier9,935-9,604
Cotton ValleyCOTTON VALLEY LIME10,545-10,214

Perforations

Perforated and open-hole intervals.

FromToType
6,4186,423Perforated
10,66610,743Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
161002056 S
8.6254,180111,375 S
5.510,8007.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 13, 1993Jan 27, 1993Yes
00Mar 2, 1993——
00Jan 12, 1984Mar 22, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34933050, documented in the API reference.