WELL · 42-349-33121 · DISTRICT 5

Gallahar Edna-Harrison #6

Plugged

Navarro County · Corsicana (Shallow) field  · Vertical

Gallahar Edna-Harrison #6 (API 42-349-33121) is a plugged well in Navarro County, plugged March 6, 1986, last operated by Navarro Petroleum Corp..

The RRC has issued one drilling permit, issued February 15, 1983, permitted to 1,050 ft.

It was permitted by Lichlyter, James W. and has since transferred to Navarro Petroleum Corp. on the wellbore schedule.

Completion filings report one formation top, including Nacotoch.

Operator of record

Navarro Petroleum Corp.

Permitted by Lichlyter, James W.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 7, 1993 · 59 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNavarro Petroleum Corp.
Production reportsnone
Latest permitLichlyter, James W.Feb 15, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,050
total depth, ft
1
permits on file
Feb 15, 1983
last permit issued
Mar 8, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 8, 1983
Shut in
—
Plugged
Mar 6, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
185982-99DrillLichlyter, James W.Feb 15, 1983Feb 15, 1983—1,050

Formation tops

As filed on W-2/G-1. Subsea from 393 ft elevation.Download CSV →

FormationMD ftSubsea
Nacotoch849-456

Perforations

Perforated and open-hole intervals.

FromToType
849852Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.59726.75110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 1984May 21, 1984—
00Jun 14, 1984May 21, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34933121, documented in the API reference.