WELL · 42-349-33259 · DISTRICT 5

Gibson #40 W

Plugged

Navarro County · Corsicana (Shallow) field  · Vertical

Gibson #40 W (API 42-349-33259) is a plugged well in Navarro County, plugged September 27, 1995, last operated by Bluff Creek Holdings LLC.

The RRC has issued one drilling permit, issued June 2, 1983, permitted to 900 ft.

It was permitted by Crown Central Petroleum Corp. and has since transferred to Bluff Creek Holdings LLC on the wellbore schedule.

Completion filings report one formation top, including Nacatoch.

Its lease has reported 13.8K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 72 wells, so these are lease totals, not this well alone.

Operator of record

Bluff Creek Holdings LLC

Permitted by Crown Central Petroleum Corp.; the EWA schedule now lists a different operator.

Colleyville, TX · P-5 Y, filed Apr 4, 2026 · (214) 543-3499

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBluff Creek Holdings LLC
Production reportsAzteca Petroleum, LLCthrough Jun 2022
Latest permitCrown Central Petroleum Corp.Jun 2, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

900
total depth, ft
1
permits on file
Jun 2, 1983
last permit issued
Oct 22, 1982
completed
13.8K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 22, 1982
Shut in
—
Plugged
Sep 27, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 72 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gibson O-5-274Corsicana (Shallow)Bluff Creek Holdings, LLC7213.8K22Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Corsicana Field FundJan 1993 → Oct 1993
  2. 2American Eagle Resources, Inc.Nov 1993 → Mar 1994
  3. 3Rife Oil Properties, Inc.Sep 1994 → Dec 2004
  4. 4Texas M.O.R., Inc.Oct 2005 → Aug 2009
  5. 5Reostar Operating IncorporatedSep 2009 → Sep 2012
  6. 6Azteca Petroleum, LLCOct 2012 → Jun 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
196994-99DrillCrown Central Petroleum Corp.Jun 2, 1983Jun 2, 1983—900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-274————

Formation tops

As filed on W-2/G-1. Subsea from 420 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch1419

Perforations

Perforated and open-hole intervals.

FromToType
876884Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.59005.5130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 1985Feb 25, 1985—
00Mar 30, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

98
bbl, last 12 reported months
4.78K
bbl, all reported
Oct 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057462H-1 InjectionPlugged Oct 6, 1995250425876–884

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 98 · prior 12 562(-83%)

05010015019941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34933259, documented in the API reference.