WELL · 42-349-34152 · DISTRICT 5

Wilson #2

Plugged

Navarro County · Powell field  · Vertical

Wilson #2 (API 42-349-34152) is a plugged well in Navarro County, plugged August 7, 2020, last operated by Kilmarnock Oil Company Inc..

The RRC has issued one drilling permit, issued October 21, 1987, permitted to 3,600 ft.

It was permitted by Juna Operating CO. and has since transferred to Kilmarnock Oil Company Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Nacatoch, Nacatosh, Pecan Gap, Austin Chalk.

Its lease has reported 62.8K barrels of oil and 644 mcf of gas since January 1993, last reporting in September 2020. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Kilmarnock Oil Company Inc.

Permitted by Juna Operating Co.; the EWA schedule now lists a different operator.

Corsicana, TX · P-5 Y, filed Oct 4, 2025 · 59 permits on file · (903) 654-2689

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKilmarnock Oil Company Inc.
Production reportsKilmarnock Oil Company, Inc.through Mar 2020
Latest permitJuna Operating Co.Oct 21, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
1
permits on file
Oct 21, 1987
last permit issued
Jul 1, 1988
completed
62.8K
cumulative oil, bbl
644
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 1988
Shut in
—
Plugged
Aug 7, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson O-5-3154PowellKilmarnock Oil Company, Inc.262.8K644Jan 1993 – Sep 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Juna Operating Co.Jan 1993 → Dec 1996
  2. 2Juna Operating, Inc.Jan 1997 → Jun 2008
  3. 3Kilmarnock Oil Company, Inc.Jul 2008 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
336943-99DrillJuna Operating Co.Oct 19, 1987Oct 21, 1987—3,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-3154————

Formation tops

As filed on W-2/G-1. Subsea from 415 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch1,140-725
Nacatosh1,140-725
Pecan Gap2,000-1,585
Austin Chalk2,120-1,705
Austin ChalkTOP AUSTIN CHALK2,120-1,705
Austin ChalkBASE AUSTIN CHALK2,580-2,165
Woodbine2,943-2,528

Perforations

Perforated and open-hole intervals.

FromToType
2,9862,987Perforated
3,3423,370Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251021140 S
5.53,4117.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 26, 1988Jul 28, 1988Yes
00Feb 24, 1988Jan 13, 1988Yes
00Feb 6, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

72.6K
bbl, last 12 reported months
3.69M
bbl, all reported
Nov 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066607H-1 InjectionPlugged Aug 27, 20206007003,342–3,370

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 72,600 · prior 12 219,000(-67%)

010K20K20192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34934152, documented in the API reference.