WELL · 42-349-34213 · DISTRICT 5
Hindman David #26
Navarro County · Corsicana (Shallow) field · Vertical
Hindman David #26 (API 42-349-34213) is a plugged well in Navarro County, plugged June 26, 2012, last operated by Northamerican Service Group.
The RRC has issued one drilling permit, issued June 8, 1988, permitted to 1,900 ft.
It was permitted by Harris Exploration Company and has since transferred to Northamerican Service Group on the wellbore schedule.
Completion filings report 2 formation tops, including U. Nacatoch Sand, L. Nacatoch Sand.
Its lease has reported 2.45K barrels of oil and 11 mcf of gas since January 1993, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Harris Exploration Company; the EWA schedule now lists a different operator.
Katy, TX · P-5 Y, filed May 4, 2026
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Northamerican Service Group |
| Production reports | Pamco Operating Companythrough Jan 2005 |
| Latest permit | Harris Exploration CompanyJun 8, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,900
- total depth, ft
- 1
- permits on file
- Jun 8, 1988
- last permit issued
- Jun 16, 1988
- completed
- 2.45K
- cumulative oil, bbl
- 11
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 16, 1988
- Shut in
- —
- Plugged
- Jun 26, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hindman, David O-5-2498 | Corsicana (Shallow) | Northamerican Service Group | 13 | 2.45K | 11 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Navco Operating Co., Inc.Jan 1993 → Feb 1993
- 2Basin Industries, Inc.Mar 1993 → Jan 1994
- 3Casey, W. J.Jun 1995 → Apr 1999
- 4Pamco Operating CompanyJun 1999 → Jan 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 347522-99 | Drill | Harris Exploration Company | Jun 8, 1988 | Jun 8, 1988 | — | 1,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-2498 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 411 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| U. Nacatoch Sand | 1,000 | -589 |
| L. Nacatoch Sand | 1,080 | -669 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,002 | 1,007 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,120 | 6.25 | 135 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 29, 1990 | Oct 5, 1988 | Yes |
| 00 | Aug 25, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-349-34213 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-349-34213 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34934213, documented in the API reference.