WELL · 42-349-34253 · DISTRICT 5
C & W #3A
Navarro County · Richland field · Vertical
C & W #3A (API 42-349-34253) is a plugged well in Navarro County, plugged November 21, 2014, last operated by Dixieland Energy LLC.
The RRC has issued one drilling permit, issued November 2, 1988, permitted to 3,400 ft.
It was permitted by Brannon, Don C. and has since transferred to Dixieland Energy LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Austin Chalk, Woodbine.
Its lease has reported 14.4K barrels of oil and 2.03K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Brannon, Don C.; the EWA schedule now lists a different operator.
Nacogdoches, TX · P-5 Y, filed Mar 4, 2026 · (970) 462-2160
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dixieland Energy LLC |
| Production reports | Dixieland Energy LLCthrough Mar 2026 |
| Latest permit | Brannon, Don C.Nov 2, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,400
- total depth, ft
- 1
- permits on file
- Nov 2, 1988
- last permit issued
- Nov 15, 1988
- completed
- 14.4K
- cumulative oil, bbl
- 2.03K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 15, 1988
- Shut in
- —
- Plugged
- Nov 21, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| C & W O-5-3261 | Richland | Dixieland Energy LLC | 3 | 14.4K | 2.03K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 6 · prior 12 895(-99%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Channell, StanJan 1993 → May 1993
- 2Miller, B. H. Oil Co.Jun 1993 → Sep 2002
- 3V.T.I.Dec 2002 → Aug 2003
- 42-K OperatingMar 2004 → Mar 2023
- 5Vec Operating, LLCApr 2023 → Oct 2024
- 6Dixieland Energy LLCMar 2026 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 352934-99 | Drill | Brannon, Don C. | Nov 2, 1988 | Nov 2, 1988 | — | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-3261 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 403 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 2,100 | -1,697 |
| Woodbine | 2,550 | -2,147 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,960 | 2,961 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 105 | 12.25 | 50 S |
| 5.5 | 3,150 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 1989 | Jan 20, 1989 | Yes |
| 00 | Apr 19, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-349-34253 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-349-34253 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34934253, documented in the API reference.