WELL · 42-349-34254 · DISTRICT 5

Ramsey-122 #3

Plugged

Navarro County · Powell field  · Vertical

Ramsey-122 #3 (API 42-349-34254) is a plugged well in Navarro County, plugged July 6, 2004, last operated by KO Operating LLC.

The RRC has issued one drilling permit, issued November 8, 1988, permitted to 3,400 ft.

It was permitted by Lanco Oil & Gas, Inc. and has since transferred to KO Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Woodbine.

Its lease has reported 52.4K barrels of oil and 31 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

KO Operating LLC

Permitted by Lanco Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Oct 4, 2025 · (740) 506-0854

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKO Operating LLC
Production reportsKO Operating LLCthrough Mar 2026
Latest permitLanco Oil & Gas, Inc.Nov 8, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,400
total depth, ft
1
permits on file
Nov 8, 1988
last permit issued
May 2, 1990
completed
52.4K
cumulative oil, bbl
31
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 2, 1990
Shut in
—
Plugged
Jul 6, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ramsey-122 O-5-3273PowellKO Operating LLC352.4K31Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 55 · prior 12 60(-8%)

0246202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maverick Expl. & Drilling Co.Jan 1993 → Jun 1995
  2. 2Lanco Oil & Gas, Inc.Jul 1995 → Jan 1998
  3. 3Global Oil CorpFeb 1998 → Apr 2008
  4. 4Duvall Operating Co.Jul 1999 → Sep 2000
  5. 5Maverick Oil CoOct 2000 → Jul 2002
  6. 6Navajo Oil and Gas, LLCMay 2008 → Dec 2023
  7. 7KO Operating LLCJan 2024 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
353153-99DrillLanco Oil & Gas, Inc.Nov 8, 1988Nov 8, 1988—3,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-3273————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Woodbine2,900

Perforations

Perforated and open-hole intervals.

FromToType
2,9702,971Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510011.2540 S
5.53,4007.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 29, 1990Jun 29, 1990—
00Oct 16, 1989Jul 21, 1989Yes
00Sep 29, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
16.1K
bbl, all reported
Nov 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077326H-1 InjectionPlugged Jul 19, 20042,0001,0002,930–3,120

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34934254, documented in the API reference.