WELL · 42-349-34529 · DISTRICT 5
Sessions #3
Navarro County · Tynes field · Vertical
Sessions #3 (API 42-349-34529) is a plugged well in Navarro County, plugged May 20, 1998, last operated by Energy Arrow Exploration LLC.
The RRC has issued one drilling permit (amended once), issued July 19, 1995, permitted to 4,200 ft.
Completion filings report 3 formation tops, including T/Austin, Woodbine, Buda.
Operator of record
Houston, TX · P-5 Y, filed Mar 7, 1997 · 7 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Energy Arrow Exploration LLC |
| Production reports | Energy Arrow Exploration, LLCthrough Jun 1996 |
| Latest permit | Energy Arrow Exploration, LLCJul 19, 1995 |
- 4,200
- total depth, ft
- 2
- permits on file
- Jul 19, 1995
- last permit issued
- Nov 15, 1995
- completed
- 0
- cumulative oil, bbl
- 14.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH May 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 15, 1995
- Shut in
- —
- Plugged
- May 20, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sessions G-5-168939 | Tynes | Energy Arrow Exploration, LLC | 1 | 0 | 14.4K | Feb 1996 – May 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Energy Arrow Exploration, LLCFeb 1996 → Jun 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 437814-98 | Drill | Energy Arrow Exploration, LLC | Jul 1, 1996 | Jul 19, 1995 | — | 4,200 |
| 437814-99 | Drill | Energy Arrow Exploration, LLC | Jul 13, 1995 | Jul 19, 1995 | Oct 14, 1995 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-168939 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 385 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,512 | 3,515 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 234 | 11 | 80 S |
| 4.5 | 4,096 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 1998 | Jan 24, 1996 | Yes |
| 00 | Jul 24, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-349-34529 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-349-34529 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34934529, documented in the API reference.