WELL · 42-349-34614 · DISTRICT 5

Fortson James E. et AL #1

Y

Navarro County · O. L. Hill (Woodbine) field · Injection  · Vertical

Fortson James E. ET AL #1 (API 42-349-34614) is a well in Navarro County operated by Gemini Energy Inc., completed December 7, 2017 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 29, 1999, permitted to 4,000 ft.

It was permitted by Key Production Company, Inc. and has since transferred to Gemini Energy Inc. on the wellbore schedule.

Completion filings report 12 formation tops, including Nacatoch, Austin Chalk, Eagle Ford, Sub-Clarksville.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 42K barrels injected in the 12 months reported through November 2025.

Operator of record

Gemini Energy Inc.

Permitted by Key Production Company, Inc.; the EWA schedule now lists a different operator.

Kerens, TX · P-5 Y, filed Aug 4, 2025 · 3 permits on file · (214) 316-1275

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGemini Energy Inc.
Production reportsClassic Operating Co. LLCthrough May 2009
Latest permitKey Production Company, Inc.Oct 29, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Oct 29, 1999
last permit issued
Dec 7, 2017
completed
0
cumulative oil, bbl
89.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 7, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fortson, James E. et AL G-5-175549O. L. Hill (Woodbine)Gemini Energy, Inc.1089.5KNov 1999 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Key Production Company, Inc.Nov 1999 → Jan 2006
  2. 2Maximus Operating, Ltd.Feb 2006 → Oct 2007
  3. 3Classic Operating Co. LLCNov 2007 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
488980-99DrillKey Production Company, Inc.Oct 29, 1999Oct 29, 1999Oct 29, 19994,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-175549————

Formation tops

As filed on W-2/G-1. Subsea from 305 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch1,810-1,505
Austin Chalk2,615-2,310
Eagle FordEAGLEFORD3,005-2,700
Sub-Clarksville3,128-2,823
Woodbine3,429-3,124
Woodbine3,430-3,125
Cotton Valley——
Glen Rose——
Paluxy——
PettitPETTET——
Rodessa——
Smackover——
Travis Peak——

Perforations

Perforated and open-hole intervals.

FromToType
3,4283,436Perforated
3,4283,462Perforated
3,4393,454Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251151140 S
4.53,6167.875210 S
4.53,6337.875210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 9, 2018Apr 4, 2018—
00Feb 16, 2000Dec 6, 1999Yes
00Feb 3, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

42K
bbl, last 12 reported months
215K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115795H-1 InjectionActive8001,7143,428–3,462

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 42,000 · prior 12 37,200(+13%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34934614, documented in the API reference.