WELL · 42-349-34637 · DISTRICT 5
Burnett -H- #2
Navarro County · Vertical
Burnett -H- #2 (API 42-349-34637) is a former disposal or injection well in Navarro County, last operated by Long Operating, L.L.C.; its UIC permit is no longer active.
The RRC has issued one drilling permit, issued January 12, 2001, permitted to 4,180 ft.
Operator of record
Shreveport, LA · P-5 Y, filed Jul 7, 2006 · 8 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Long Operating, L.L.C.Jan 12, 2001 |
- 4,180
- total depth, ft
- 1
- permits on file
- Jan 12, 2001
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 503879-99 | Drill | Long Operating, L.L.C. | Jan 10, 2001 | Jan 12, 2001 | — | 4,180 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-349-34637 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-349-34637 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000090745 | H-1 Injection | Not activated | 2,500 | 1,900 | 3,860–4,150 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/34934637, documented in the API reference.