WELL · 42-349-34709 · DISTRICT 5

Tyner Joe #1

Plugged

Navarro County · Reiter N. (750) field  · Vertical

Tyner Joe #1 (API 42-349-34709) is a plugged well in Navarro County, plugged October 30, 2007, last operated by Warrior Resources Inc..

The RRC has issued one drilling permit, issued April 13, 2005, permitted to 900 ft.

Completion filings report 3 formation tops, including Tehuacana Lime, Navarro, Nacatoch.

Operator of record

Warrior Resources Inc.

Mexia, TX · P-5 Y, filed Sep 2, 2022 · 28 permits on file · (405) 590-0118

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWarrior Resources Inc.
Production reportsnone
Latest permitWarrior Resources Inc.Apr 13, 2005
900
total depth, ft
1
permits on file
Apr 13, 2005
last permit issued
Jun 30, 2006
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Jan 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 30, 2006
Shut in
—
Plugged
Oct 30, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tyner, Joe O-5-3835Reiter,n. (750)Warrior Resources Inc.100Jan 2007 – Jan 2008

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
560314-99DrillWarrior Resources Inc.Apr 11, 2005Apr 13, 2005May 18, 2006900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-3835————

Formation tops

As filed on W-2/G-1. Subsea from 412 ft elevation.Download CSV →

FormationMD ftSubsea
Tehuacana Lime36250
NavarroNAVARRO CHALKSAND738-326
NavarroNAVARRO CHALK739-327
NacatochMIDDLE NACATOCH SAND778-366
NacatochLOWER NACATOCH SAND822-410

Perforations

Perforated and open-hole intervals.

FromToType
739745Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625561135 S
4.58206.625120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 2007Jan 26, 2007Yes
00Feb 27, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34934709, documented in the API reference.