WELL · 42-349-34727 · DISTRICT 5

Ward #1

Plugged

Navarro County · Wildcat field  · Vertical

Ward #1 (API 42-349-34727) is a plugged well in Navarro County, plugged August 17, 2007, last operated by Camterra Resources Inc..

The RRC has issued one drilling permit, issued September 28, 2005, permitted to 12,000 ft.

Completion filings report 6 formation tops, including B/Austin Chalk, T/Massive Anhydrite, B/Massive Anhydrite, T/Travis Peak.

Operator of record

Camterra Resources Inc.

Marshall, TX · P-5 Y, filed Feb 4, 2026 · 38 permits on file · (800) 261-3282

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCamterra Resources Inc.
Production reportsnone
Latest permitCamterra Resources, Inc.Sep 28, 2005
12,000
total depth, ft
1
permits on file
Sep 28, 2005
last permit issued
Dec 20, 2005
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Aug 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 20, 2005
Shut in
—
Plugged
Aug 17, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ward G-5-218662WildcatCamterra Resources, Inc.100Dec 2005 – Aug 2007

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
607017-99DrillCamterra Resources, Inc.Sep 27, 2005Sep 28, 2005Nov 29, 200512,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-218662————

Formation tops

As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk3,255-2,914
T/Massive Anhydrite6,295-5,954
B/Massive Anhydrite6,465-6,124
T/Travis Peak7,290-6,949
T/Cotton Valley8,780-8,439
T/Cotton Valley Lime11,140-10,799

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,59412.25620 S
5.511,6987.8751,201 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 2007May 15, 2006Yes
00Sep 1, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34934727, documented in the API reference.