WELL · 42-349-34890 · DISTRICT 5

McKinney #5B

Y

Navarro County · Corsicana (Shallow) field · Producing  · Vertical

Mckinney #5B (API 42-349-34890) is a well in Navarro County operated by Dry Creek Operating LLC, completed September 13, 2009 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 23, 2009, permitted to 1,999 ft.

It was permitted by Texas M.O.R., Inc. and has since transferred to Dry Creek Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Nacatoch, Pecan Gap.

Its lease has reported 39.5K barrels of oil and 26 mcf of gas since January 1993, last reporting in July 2026. The lease carries 28 wells, so these are lease totals, not this well alone.

Operator of record

Dry Creek Operating LLC

Permitted by Texas M.O.R., Inc.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Feb 4, 2026 · 16 permits on file · (817) 991-2432

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDry Creek Operating LLC
Production reportsDry Creek Operating, LLCthrough Mar 2026
Latest permitTexas M.O.R., Inc.Apr 23, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Apr 23, 2009
last permit issued
Sep 13, 2009
completed
39.5K
cumulative oil, bbl
26
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 13, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 28 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McKinney O-5-289Corsicana (Shallow)Dry Creek Operating, LLC2839.5K26Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 42 · prior 12 289(-85%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Corsicana Field FundJan 1993 → Oct 1993
  2. 2American Eagle Resources, Inc.Nov 1993 → May 1994
  3. 3Rife Oil Properties, Inc.Jul 1994 → Dec 2004
  4. 4Rife Energy Operating, Inc.Mar 2005 → Aug 2005
  5. 5Texas M.O.R., Inc.Sep 2005 → Aug 2009
  6. 6Reostar Operating IncorporatedSep 2009 → Aug 2012
  7. 7Azteca Petroleum, LLCOct 2012 → Jul 2022
  8. 8Dry Creek Operating, LLCAug 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
680455-99DrillTexas M.O.R., Inc.Apr 16, 2009Apr 23, 2009Jul 20, 20091,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-289————

Formation tops

As filed on W-2/G-1. Subsea from 363 ft elevation.Download CSV →

FormationMD ftSubsea
NacatochNACATOCH (LOWER)750-387
Pecan Gap1,526-1,163

Perforations

Perforated and open-hole intervals.

FromToType
1,5301,550Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,6527.875270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 18, 2010Oct 22, 2009Yes
00Oct 28, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/34934890, documented in the API reference.