WELL · 42-351-00032 · DISTRICT 3

Quicksand Creek Field Unit #25

Plugged

Newton County · Quicksand Creek (Wilcox 11 000) field  · Vertical

Quicksand Creek Field Unit #25 (API 42-351-00032) is a plugged well in Newton County, plugged June 23, 1972, last operated by Sinclair Carl Oil Well Service.

The RRC has issued one drilling permit, issued June 4, 1998, permitted to 10,350 ft.

It was permitted by Axis Energy Corporation and has since transferred to Sinclair Carl Oil Well Service on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Its lease has reported 216K barrels of oil and 1.12M mcf of gas since January 1996, last reporting in June 2024. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

Sinclair Carl Oil Well Service

Permitted by Axis Energy Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Aug 15, 1984

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSinclair Carl Oil Well Service
Production reportsP.O.S. Energy, Inc.through Feb 2013
Latest permitAxis Energy CorporationJun 4, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,350
total depth, ft
1
permits on file
Jun 4, 1998
last permit issued
Oct 1, 1963
completed
216K
cumulative oil, bbl
1.12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jun 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 1, 1963
Shut in
—
Plugged
Jun 23, 1972

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Quicksand Creek O-3-22905Quicksand Creek (Wilcox)Will-Drill Production Co., Inc.7216K1.12MJan 1996 – Jun 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Caskids Operating CompanyJan 1996 → Nov 1996
  2. 2Axis Energy CorporationDec 1996 → Aug 1999
  3. 3Phoenix Oil & Gas Ltd., L.L.P.Sep 1999 → Mar 2003
  4. 4Continental Operating Co.Jun 2003 → Jul 2006
  5. 5P.O.S. Energy, Inc.Nov 2006 → Feb 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
475579-99ReenterAxis Energy CorporationApr 23, 1998Jun 4, 1998Jun 15, 199810,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22905————

Formation tops

As filed on W-2/G-1. Subsea from 104 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox7,950-7,846

Perforations

Perforated and open-hole intervals.

FromToType
9,8329,839Perforated
10,47610,488Perforated
10,78710,794Perforated
11,00411,014Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.754,014——
5.511,3007.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 26, 1998Aug 10, 1998Yes
00Aug 12, 1998——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111295UIC PermitCanceled Nov 14, 20140010,794–10,801

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35100032, documented in the API reference.