WELL · 42-351-00035 · DISTRICT 3

Quicksand Creek Field Unit #22

Plugged

Newton County · Quicksand Creek (Wilcox 11 100) field  · Vertical

Quicksand Creek Field Unit #22 (API 42-351-00035) is a plugged well in Newton County, plugged May 24, 1972, last operated by Atlantic Richfield CO..

The RRC has issued 2 drilling permits between 1995 and 1997, permitted to 10,411 ft.

It was permitted by Axis Energy Corporation and has since transferred to Atlantic Richfield CO. on the wellbore schedule.

Its 2 leases have reported 267K barrels of oil and 1.22M mcf of gas since July 1995, last reporting in June 2024. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Atlantic Richfield Co.

Permitted by Axis Energy Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 8, 1993 · 627 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAtlantic Richfield Co.
Production reportsP.O.S. Energy, Inc.through Feb 2013
Latest permitAxis Energy CorporationApr 24, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,411
total depth, ft
2
permits on file
Apr 24, 1997
last permit issued
Oct 1, 1962
completed
267K
cumulative oil, bbl
1.22M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH Jun 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 1, 1962
Shut in
—
Plugged
May 24, 1972

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Quicksand Creek O-3-22905Quicksand Creek (Wilcox)Will-Drill Production Co., Inc.7216K1.12MJan 1996 – Jun 2024
Quicksand Creek O-3-22751Quicksand Creek (Wilcox 9,870)Axis Energy Corporation251.6K106KJul 1995 – Apr 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Caskids Operating CompanyJul 1995 → Nov 1996
  2. 2Axis Energy CorporationDec 1996 → Aug 1999
  3. 3Phoenix Oil & Gas Ltd., L.L.P.Sep 1999 → Mar 2003
  4. 4Continental Operating Co.Jun 2003 → Jul 2006
  5. 5P.O.S. Energy, Inc.Nov 2006 → Feb 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
461540-99Field transferAxis Energy CorporationApr 23, 1997Apr 24, 1997Jul 1, 199510,411
438067-99ReenterCaskids Operating CompanyJul 20, 1995Jul 20, 1995Jul 1, 199510,411

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22751————
—— O-3-22905————

Perforations

Perforated and open-hole intervals.

FromToType
9,8309,852Perforated
10,52810,538Perforated
11,10811,123Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1680——
10.753,98914.751,110 S
8.6254,1509.87575 S
5.511,2507.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 1997Jan 30, 1996—
00Apr 29, 1997Jul 21, 1995Yes
00Aug 22, 1995Jul 21, 1995Yes
00Aug 3, 1995——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35100035, documented in the API reference.