WELL · 42-351-00397 · DISTRICT 3

Morgan, C. A. "B" #1

Plugged

Newton County  · Vertical

Morgan, C. A. "B" #1 (API 42-351-00397) is a plugged well in Newton County, plugged April 6, 2000, last operated by Mcgowan Working Partners.

The RRC has issued one drilling permit, issued February 17, 2000, permitted to 7,600 ft.

Operator of record

McGowan Working Partners

Jackson, MS · P-5 Y, filed Aug 6, 1999 · 76 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMcGowan Working PartnersFeb 17, 2000
7,600
total depth, ft
1
permits on file
Feb 17, 2000
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 6, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
492092-99ReenterMcGowan Working PartnersFeb 14, 2000Feb 17, 2000Mar 23, 20007,600

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089727W-14 DisposalCanceled Jun 27, 20227,0001005,600–6,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35100397, documented in the API reference.