WELL · 42-351-30141 · DISTRICT 3
Kirby Arco #1SW
Newton County · Quicksand Creek (Wilcox) field · Vertical
Kirby Arco #1SW (API 42-351-30141) is a plugged well in Newton County, plugged January 23, 2019, last operated by Will-Drill Production CO. Inc..
The RRC has issued one drilling permit, issued May 28, 1998, permitted to 3,996 ft.
It was permitted by Axis Energy Corporation and has since transferred to Will-Drill Production CO. Inc. on the wellbore schedule.
Operator of record
Will-Drill Production Co. Inc.
Permitted by Axis Energy Corporation; the EWA schedule now lists a different operator.
Shreveport, LA · P-5 Y, filed Oct 4, 2025 · 49 permits on file · (318) 629-3107
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Will-Drill Production Co. Inc. |
| Production reports | none |
| Latest permit | Axis Energy CorporationMay 28, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,996
- total depth, ft
- 1
- permits on file
- May 28, 1998
- last permit issued
- Aug 29, 1995
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1998 THROUGH Jan 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 29, 1995
- Shut in
- —
- Plugged
- Jan 23, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kirby Arco G-3-169143 | Quicksand Creek (Wilcox) | Will-Drill Production Co., Inc. | 1 | 0 | 0 | Apr 1998 – Jan 2019 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 475545-99 | Reenter | Axis Energy Corporation | Apr 22, 1998 | May 28, 1998 | May 30, 1995 | 3,996 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-169143 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,964 | 3,984 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 4,050 | 17.25 | 410 S |
| 9.625 | 4,222 | 12.25 | 75 S |
| 9.625 | 4,222 | 12.5 | 75 S |
| 5.5 | 11,454 | 8.75 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 14, 1998 | Apr 21, 1998 | — |
| 00 | Aug 4, 1998 | — | Yes |
| 00 | Jan 12, 1984 | May 23, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-351-30141 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-351-30141 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 647K
- bbl, all reported
- Dec 2018
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000083624 | W-14 Disposal | Plugged Feb 8, 2019 | 1,500 | 300 | 3,964–3,984 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35130141, documented in the API reference.