WELL · 42-351-30355 · DISTRICT 3
Arco Fee #1
Newton County · Dempsey Creek (Wilcox) field · Vertical
Arco Fee #1 (API 42-351-30355) is a plugged well in Newton County, plugged December 16, 1998, last operated by Hallwood Petroleum Inc..
The RRC has issued 2 drilling permits between 1981 and 1999, permitted to 13,000 ft.
It was permitted by Trans-Sabine Pipeline Corp and has since transferred to Hallwood Petroleum Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, Cockfield, Wilcox.
Operator of record
Permitted by Trans-Sabine Pipeline Corp; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Mar 1, 2002 · 343 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hallwood Petroleum Inc. |
| Production reports | Hallwood Petroleum, Inc.through Jul 1998 |
| Latest permit | Trans-Sabine Pipeline CorpOct 8, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,000
- total depth, ft
- 2
- permits on file
- Oct 8, 1999
- last permit issued
- Oct 19, 1981
- completed
- 0
- cumulative oil, bbl
- 416K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 19, 1981
- Shut in
- —
- Plugged
- Dec 16, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Levine G-3-177451 | Dempsey Creek (Wilcox) | D and J Operating, LLC | 1 | 0 | 0 | Jun 2000 – Jul 2026 |
| Arco Fee G-3-97560 | Dempsey Creek (Wilcox) | Hallwood Petroleum, Inc. | 1 | 0 | 416K | Jan 1993 – Oct 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hallwood Petroleum, Inc.Jan 1993 → Jul 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 488309-99 | Reenter | Trans-Sabine Pipeline Corp | Oct 8, 1999 | Oct 8, 1999 | Oct 29, 1999 | 12,502 |
| 124320-99 | Drill | Longhorn Oil&gas Co. | Jul 8, 1981 | Jul 8, 1981 | Aug 5, 1981 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-97560 | — | — | — | — |
| — | — G-3-177451 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 68 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,657 | 11,706 | Perforated |
| 11,919 | 12,000 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,506 | 12.25 | 950 S |
| 2.875 | 11,860 | — | — |
| 5.5 | 12,303 | 8.5 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 31, 2000 | Jun 5, 2000 | — |
| 00 | Jul 7, 2000 | — | — |
| 00 | Jan 12, 1984 | Nov 18, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-351-30355 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-351-30355 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35130355, documented in the API reference.