WELL · 42-351-30532 · DISTRICT 6

Texaco #1D

Plugged

Newton County · Brookeland (Austin Chalk 8800) field  · Vertical

Texaco #1D (API 42-351-30532) is a plugged well in Newton County, plugged December 30, 1997, last operated by Rme Petroleum Company.

The RRC has issued one drilling permit, issued December 2, 1991, permitted to 3,650 ft.

It was permitted by Maersk Energy Inc. and has since transferred to Rme Petroleum Company on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Its lease has reported 5.58K barrels of oil and 53.8K mcf of gas since January 1993, last reporting in February 2001. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Rme Petroleum Company

Permitted by Maersk Energy Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 5, 2018 · 512 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRme Petroleum Company
Production reportsUnion Pacific Resources Companythrough Oct 1994
Latest permitMaersk Energy Inc.Dec 2, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,650
total depth, ft
1
permits on file
Dec 2, 1991
last permit issued
Feb 25, 1992
completed
5.58K
cumulative oil, bbl
53.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 1992
Shut in
—
Plugged
Dec 30, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Texaco O-6-12883Brookeland (Austin Chalk, 8800)Rme Petroleum Company35.58K53.8KJan 1993 – Feb 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maersk Energy Inc.Jan 1993 → Dec 1993
  2. 2Union Pacific Resources CompanyJan 1994 → Oct 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
394525-99DrillMaersk Energy Inc.Nov 27, 1991Dec 2, 1991Jan 14, 19923,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-12883————

Formation tops

As filed on W-2/G-1. Subsea from 293 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox2,710-2,417

Perforations

Perforated and open-hole intervals.

FromToType
3,2453,275Perforated
3,3453,365Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62548812.25250 S
5.53,4697.875580 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 16, 1992Mar 16, 1992Yes
00Apr 7, 1992Feb 24, 1992—
00Mar 31, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.02M
bbl, all reported
Jan 1998
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000076101W-14 DisposalPlugged Feb 24, 19982,4407503,160–3,385

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 263,082(-100%)

010K20K30K19971998

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35130532, documented in the API reference.