WELL · 42-351-30721 · DISTRICT 3

WRC Hankamer #1

Plugged

Newton County  · Directional

Wrc Hankamer #1 (API 42-351-30721) is a plugged well in Newton County, plugged March 7, 2003, last operated by Westport Oil And Gas Company, LP.

The RRC has issued one drilling permit (amended once), issued May 21, 2002, permitted to 12,500 ft.

Operator of record

Westport Oil and Gas Company, LP

The Woodlands, TX · P-5 Y, filed Oct 5, 2007 · 217 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWestport Oil and Gas Company, LPMay 21, 2002
12,500
total depth, ft
2
permits on file
May 21, 2002
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 7, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
520038-98DrillWestport Oil and Gas Company, LPOct 1, 2002May 21, 2002Nov 28, 200212,500
520038-99DrillReef Exploration, Inc. (A-1)May 16, 2002May 21, 2002—11,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35130721, documented in the API reference.