WELL · 42-351-30728 · DISTRICT 3
Hankamer - Elm #1
Newton County · Cypress Creek East (Frio 4800) field · Directional
Hankamer - Elm #1 (API 42-351-30728) is a plugged well in Newton County, plugged March 17, 2009, last operated by Petro-Guard Production L.L.C..
The RRC has issued one drilling permit, issued October 10, 2003, permitted to 5,300 ft.
It was permitted by Eog Resources, Inc. and has since transferred to Petro-Guard Production L.L.C. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Aug 4, 2025 · 37 permits on file · (713) 974-5550
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petro-Guard Production L.L.C. |
| Production reports | Petro-Guard Production,l.l.c.through Jul 2008 |
| Latest permit | EOG Resources, Inc.Oct 10, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,300
- total depth, ft
- 1
- permits on file
- Oct 10, 2003
- last permit issued
- Jan 22, 2004
- completed
- 0
- cumulative oil, bbl
- 1.23M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2004 THROUGH Mar 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 22, 2004
- Shut in
- —
- Plugged
- Mar 17, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hankamer - Elm G-3-204348 | Cypress Creek, East (Frio 4800) | Petro-Guard Production,l.l.c. | 1 | 0 | 1.23M | Jan 2004 – Mar 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Jun 2004 → Jul 2006
- 2Petro-Guard Production,l.l.c.Aug 2006 → Jul 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 537400-99 | Drill | EOG Resources, Inc. | Oct 10, 2003 | Oct 10, 2003 | Dec 11, 2003 | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-204348 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 39 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 4,750 | -4,711 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,840 | 4,844 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,650 | 11 | 868 S |
| 4.5 | 5,434 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 2005 | Nov 4, 2004 | — |
| 00 | Feb 8, 2005 | Jul 21, 2004 | Yes |
| 00 | Nov 30, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-351-30728 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-351-30728 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35130728, documented in the API reference.