WELL · 42-351-30778 · DISTRICT 3
Donner A #1
Newton County · Cluster (Nodosaria) field · Directional
Donner A #1 (API 42-351-30778) is a well in Newton County operated by Xto Energy Inc., completed May 14, 2008.
The RRC has issued 2 drilling permits between 2006 and 2008, permitted to 9,105 ft.
Its 2 leases have reported 12.5K barrels of oil and 848K mcf of gas since July 2006, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2015 |
| Latest permit | XTO Energy Inc.Jun 4, 2008 |
- 9,105
- total depth, ft
- 2
- permits on file
- Jun 4, 2008
- last permit issued
- May 14, 2008
- completed
- 12.5K
- cumulative oil, bbl
- 848K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 14, 2008
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Donner A O-3-25511 | Hartburg, NW. (7600) | Olipdp II, LLC | 1 | 12.5K | 69.7K | Mar 2010 – Jul 2026 |
| Donner A G-3-219126 | Cluster (Nodosaria) | XTO Energy Inc. | 1 | 0 | 779K | Jul 2006 – Mar 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dominion Expl. & Prod., Inc.Aug 2006 → Jul 2007
- 2XTO Energy Inc.May 2008 → Apr 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 662048-99 | Recompletion | XTO Energy Inc. | May 15, 2008 | Jun 4, 2008 | Mar 22, 2010 | 7,702 |
| 615057-99 | Drill | Dominion Expl. & Prod., Inc. | Mar 1, 2006 | Mar 1, 2006 | Mar 10, 2006 | 9,105 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-219126 | — | — | — | — |
| — | — O-3-25511 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,708 | 7,730 | Perforated |
| 7,752 | 7,768 | Perforated |
| 7,778 | 7,788 | Perforated |
| 7,801 | 7,812 | Perforated |
| 7,910 | 7,913 | Perforated |
| 7,946 | 7,952 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,050 | 12.25 | 1,115 S |
| 4.5 | 8,212 | 8.5 | 860 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 2010 | Apr 22, 2010 | Yes |
| 00 | Jun 11, 2010 | — | — |
| 00 | Aug 14, 2008 | Jun 23, 2008 | — |
| 00 | Mar 11, 2008 | Dec 18, 2007 | — |
| 00 | Feb 10, 2007 | Aug 10, 2006 | Yes |
| 00 | Sep 19, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-351-30778 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-351-30778 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35130778, documented in the API reference.