WELL · 42-351-30834 · DISTRICT 3
BP Black Stone a-632 SWD #1
Newton County · Magnolia Springs (Austin Chalk) field · Vertical
BP Black Stone A-632 Swd #1 (API 42-351-30834) is a plugged well in Newton County, plugged April 19, 2013, last operated by Anadarko E&P Onshore LLC.
The RRC has issued one drilling permit, issued November 30, 2009, permitted to 8,000 ft.
It was permitted by Anadarko E&P Company LP and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Sep 4, 2025 · 4,574 permits on file · (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anadarko E&P Onshore LLC |
| Production reports | none |
| Latest permit | Anadarko E&P Company LPNov 30, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 1
- permits on file
- Nov 30, 2009
- last permit issued
- Feb 5, 2010
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2010 THROUGH Apr 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 5, 2010
- Shut in
- —
- Plugged
- Apr 19, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| BP Black Stone a-632 SWD G-3-257150 | Magnolia Springs (Austin Chalk) | Anadarko E&P Onshore LLC | 1 | 0 | 0 | Feb 2010 – Apr 2013 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 687951-99 | Drill | Anadarko E&P Company LP | Nov 25, 2009 | Nov 30, 2009 | Jan 24, 2010 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-257150 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,854 | 5,968 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,300 | 14.75 | 2,000 S |
| 7.625 | 6,601 | 9.875 | 1,075 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 23, 2010 | Apr 8, 2010 | — |
| 00 | Sep 3, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-351-30834 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-351-30834 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.7M
- bbl, all reported
- Dec 2013
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000101405 | W-14 Disposal | Plugged May 17, 2013 | 20,000 | 2,150 | 4,300–6,500 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 127,291(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35130834, documented in the API reference.