WELL · 42-351-30836 · DISTRICT 3
BP Black Stone a-472 SWD #1
Newton County · Magnolia Springs (Austin Chalk) field · Horizontal
BP Black Stone A-472 Swd #1 (API 42-351-30836) is a disposal or injection well in Newton County operated by Anadarko E&P Company LP under an active UIC permit.
The RRC has issued 2 drilling permits in 2010, permitted to 16,000 ft.
Completion filings report 3 formation tops, including Frio, Wilcox, Navarro.
It holds an active disposal or injection permit, with 47.1K barrels injected in the 12 months reported through December 2025.
Operator of record
Houston, TX · P-5 Y, filed Jul 4, 2025 · 2,635 permits on file · (832) 636-1111
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anadarko E&P Company LP |
| Production reports | none |
| Latest permit | Anadarko E&P Company LPJul 9, 2010 |
- 16,000
- total depth, ft
- 2
- permits on file
- Jul 9, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| BP Black Stone a-472 Unit G-3-257521 | Magnolia Springs (Austin Chalk) | Zarvona Energy LLC | 1 | 0 | 0 | Apr 2010 – Jul 2026 |
| BP Black Stone a-472 SWD G-3-258899 | Magnolia Springs (Austin Chalk) | Anadarko E&P Company LP | 1 | 0 | 0 | Aug 2010 – Aug 2010 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 698210-99 | Recompletion | Anadarko E&P Company LP | Jun 28, 2010 | Jul 9, 2010 | — | 13,000 |
| 690145-99 | Drill | Anadarko E&P Company LP | Jan 22, 2010 | Jan 27, 2010 | Mar 28, 2010 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-257521 | — | — | — | — |
| — | — G-3-258899 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 270 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,412 | 5,339 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,115 | 17.5 | 4,040 S |
| 13.375 | 3,211 | 17.5 | 4,040 S |
| 9.625 | 6,876 | 12.25 | 2,360 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 22, 2011 | Nov 15, 2010 | — |
| 00 | Feb 16, 2011 | — | — |
| 00 | Sep 28, 2010 | Jul 12, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-351-30836 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-351-30836 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 47.1K
- bbl, last 12 reported months
- 6.21M
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000101677 | W-14 Disposal | Active | 20,000 | 1,850 | 3,700–5,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 47,055 · prior 12 16,787(+180%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35130836, documented in the API reference.