WELL · 42-353-30031 · DISTRICT 7

South Neill Unit-South #4

Plugged

Nolan County · Neill So. (Odom Lime) field  · Vertical

South Neill Unit-South #4 (API 42-353-30031) is a plugged well in Nolan County, plugged August 2, 1990, last operated by Texstar North America Inc..

The RRC has issued one drilling permit, issued March 14, 1989, permitted to 5,860 ft.

It was permitted by Texstar Energy Operators, Inc. and has since transferred to Texstar North America Inc. on the wellbore schedule.

Operator of record

Texstar North America Inc.

Permitted by Texstar Energy Operators, Inc.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTexstar Energy Operators, Inc.Mar 14, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,860
total depth, ft
1
permits on file
Mar 14, 1989
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 2, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
357029-99ReenterTexstar Energy Operators, Inc.Mar 14, 1989Mar 14, 1989Jul 14, 19895,860

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118001H-1 InjectionPlugged Sep 10, 19901,2007005,765–5,771

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35330031, documented in the API reference.