WELL · 42-353-31404 · DISTRICT 7
Jameson, Jahew 'C' #3
Nolan County · Vertical
Jameson, Jahew 'C' #3 (API 42-353-31404) is a permitted well in Nolan County filed by Graham Energy, Ltd.; no completion report is on file yet.
The RRC has issued 5 drilling permits between 1982 and 1983, permitted to 7,500 ft.
Its 2 leases have reported 84 barrels of oil and 273 mcf of gas since January 1993, last reporting in February 1995. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Post, TX · P-5 Y, filed Oct 4, 2025 · 33 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Field Production Companythrough Apr 1994 |
| Latest permit | Graham Energy, Ltd.Jul 8, 1983 |
- 7,500
- total depth, ft
- 5
- permits on file
- Jul 8, 1983
- last permit issued
- —
- completed
- 84
- cumulative oil, bbl
- 273
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jameson, Jahew "C" O-9-13352 | Silver (Canyon) | Field Production Company | 1 | 84 | 273 | Jan 1993 – Feb 1995 |
| Jameson, Jahew "C" G-9-106385 | Silver (Canyon) | Field Production Company | 1 | 0 | 0 | Jan 1993 – May 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Field Production CompanyJan 1993 → Sep 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 201622-99 | Recompletion | Graham Energy, Ltd. | Jul 8, 1983 | Jul 8, 1983 | — | 7,500 |
| 201620-99 | Recompletion | Graham Energy, Ltd. | Jul 8, 1983 | Jul 8, 1983 | — | 7,500 |
| 200353-99 | Drill | Graham Exploration, Ltd. | Jul 5, 1983 | Jul 5, 1983 | — | 7,500 |
| 182177-99 | Drill | Graham Energy, Ltd. | Dec 31, 1982 | Dec 31, 1982 | — | 7,500 |
| 182175-99 | Drill | Graham Energy, Ltd. | Dec 31, 1982 | Dec 31, 1982 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-106385 | — | — | — | — |
| — | — O-9-13352 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,966 | 6,072 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 566 | 11 | 275 S |
| 8.625 | 566 | 12.25 | 275 S |
| 2.375 | 5,920 | — | — |
| 2.375 | 7,256 | — | — |
| 5.5 | 7,288 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 15, 1993 | Dec 7, 1992 | — |
| 00 | Dec 22, 1992 | — | — |
| 00 | Jan 12, 1984 | Jul 11, 1983 | — |
| 00 | Jan 12, 1984 | May 23, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-31404 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-31404 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35331404, documented in the API reference.