WELL · 42-353-31597 · DISTRICT 7

Sears-Streater #1

Plugged

Nolan County · Sears Northeast (Strawn Sand) field  · Vertical

Sears-Streater #1 (API 42-353-31597) is a plugged well in Nolan County, plugged April 16, 2002, last operated by E.S.I..

The RRC has issued 3 drilling permits between 1984 and 1989, permitted to 6,200 ft.

It was permitted by Texzona Oil & Gas, Inc. and has since transferred to E.S.I. on the wellbore schedule.

Completion filings report 10 formation tops, including Noodle Creek Ls., Top Noodle Creek Lime, Top Noodle Creek Ls, Base Blk Shale Mkr.

Operator of record

E.S.I.

Permitted by Texzona Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Dec 12, 1997 · 24 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleE.S.I.
Production reportsnone
Latest permitTexzona Oil & Gas, Inc.May 22, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,200
total depth, ft
3
permits on file
May 22, 1989
last permit issued
Jan 17, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 17, 1985
Shut in
—
Plugged
Apr 16, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sears-Streater O-8-23944Holley (Ellenburger)Reichmann Petroleum Corp.100Jan 1993 – May 2005

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
359321-99RecompletionTexzona Oil & Gas, Inc.May 15, 1989May 22, 1989—6,004
320747-99RecompletionE.S.I.Sep 18, 1986Sep 22, 1986—6,005
233413-99DrillMecca Energy, Inc.Feb 4, 1985Mar 26, 1984Jul 27, 19846,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23944————

Formation tops

As filed on W-2/G-1. Subsea from 1,932 ft elevation.Download CSV →

FormationMD ftSubsea
Noodle Creek Ls.2,955-1,023
Top Noodle Creek Lime2,955-1,023
Top Noodle Creek LS2,955-1,023
Base BLK Shale MKR5,158-3,226
StrawnTOP STRAWN SAND5,366-3,434
StrawnTOP STRAWN SD5,366-3,434
Odom LS5,605-3,673
Top Odem Ls.5,605-3,673
Top Odom Lime5,605-3,673
CaddoCADDO LS5,807-3,875
CaddoTOP CADDO LIME5,807-3,875
CaddoTOP CADDO LS5,807-3,875
Ellen. Dolo.5,868-3,936

Perforations

Perforated and open-hole intervals.

FromToType
3,4643,480Perforated
3,5553,570Perforated
5,3675,371Perforated
5,9325,934Perforated
—5,371Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62532112.25300 S
5.56,0047.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 23, 1990Jun 8, 1990—
00Jun 26, 1987Jun 17, 1987—
00Oct 10, 1986Sep 22, 1986Yes
00Sep 25, 1986——
00Mar 14, 1985Jan 28, 1985—
00Mar 1, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
4.34M
bbl, all reported
Nov 2002
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000062940W-14 DisposalPlugged Jul 22, 20035,0001,6003,250–3,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 177,000(-100%)

010K20K30K20012002

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35331597, documented in the API reference.