WELL · 42-353-32212 · DISTRICT 7

Harris Railroad Unit No. 7 #1

Y

Nolan County · Lake Trammel S. (5150) field · Producing  · Vertical

Harris Railroad Unit NO. 7 #1 (API 42-353-32212) is a well in Nolan County operated by Lakeshore Operating LLC, completed March 17, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 19, 1993, permitted to 5,500 ft.

It was permitted by Tucker Drilling Company, Inc. and has since transferred to Lakeshore Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including T/Tubb, T/Colemen Junction, T/Noodle Creek, T/Saddle Creek.

Its lease has reported 72.3K barrels of oil and 359K mcf of gas since March 1993, last reporting in July 2026.

Operator of record

Lakeshore Operating LLC

Permitted by Tucker Drilling Company, Inc.; the EWA schedule now lists a different operator.

Wichita, KS · P-5 Y, filed Oct 4, 2025 · (855) 771-4828

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLakeshore Operating LLC
Production reportsLakeshore Operating, LLCthrough Apr 2026
Latest permitTucker Drilling Company, Inc.Feb 19, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
Feb 19, 1993
last permit issued
Mar 17, 1993
completed
72.3K
cumulative oil, bbl
359K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 17, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harris Railroad Unit No. 7 O-8-26842Lake Trammel, S. (5150)Lakeshore Operating, LLC172.3K359KMar 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 2,398 · prior 12 4,092(-41%)

0200400600202420252026

Oil, barrels lease total

Last 12 months 271 · prior 12 431(-37%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tucker Drilling Company, Inc.Mar 1993 → Jul 1996
  2. 2Patterson Petroleum, Inc.Aug 1996 → Feb 2000
  3. 3Patterson Petroleum LPMar 2000 → Nov 2003
  4. 4Katsco Energy, Inc.Dec 2003 → Apr 2025
  5. 5Lakeshore Operating, LLCMay 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
409195-99DrillTucker Drilling Company, Inc.Feb 19, 1993Feb 19, 1993Feb 26, 19935,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-26842————

Formation tops

As filed on W-2/G-1. Subsea from 2,465 ft elevation.Download CSV →

FormationMD ftSubsea
T/Tubb2,032433
T/Colemen Junction3,568-1,103
T/Noodle Creek3,780-1,315
T/Saddle Creek3,920-1,455
T/Swastika4,504-2,039
T/Canyon Sand4,940-2,475

Perforations

Perforated and open-hole intervals.

FromToType
4,9415,002Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540711300 S
—4,257—700 S
5.55,4007.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 7, 1993Mar 23, 1993Yes
00Mar 29, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35332212, documented in the API reference.